BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Maple Grove, Minnesota. Completed plans call for site work for a water / sewer project.

**As of May 9, 2024, the project was awarded to Innovative High-Performance Coatings, for $342,800.00.** PROJECT DESCRIPTION: This Project consists of manhole rehabilitation of existing sanitary manholes. In general, Work consists of the following approximate quantities: 840 LF Manhole Rehabilitation 450 SF Bench and Invert Repair 400 GAL Manhole Rehabilitation Joint Grouting Along with, bench and invert repair, erosion control, traffic control, restoration, and related appurtenances. Direct inquiries to Engineer's Construction Manager, Cody Blehr, at (701) 202-8273. Each Bid, in accordance with the Instructions to Bidders, shall be accompanied by a Bidder's Bond naming the City of Maple Grove as oblige, certified check payable to the Clerk of the City of Maple Grove or a cash deposit equal to at least 5 percent of the amount of the Bid, which shall be forfeited to the City in the event that the Bidder fails to enter into a Contract. The City Council reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract in the best interests of the City. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor.

Award

Water / Sewer

$342,800.00

Public - City

Site Work

13

9

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
48
Bidding Soon
787
All Active Projects
350
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Maple Grove, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.