BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a playground / park / athletic field in Sedalia, Missouri. Completed plans call for the construction of a 25,600-square-foot playground / park / athletic field; and for site work for a playground / park / athletic field.

Overview: It is the Owner's intent to construct a new climatized maintenance shop, with minimum size of 25,600 sqft. 1.2 Background Information: The Missouri State Fairgrounds (MSF), located at 2503 West 16th Street in Sedalia, Missouri, is an approximately 597-acre area consisting of a variety of structures, campgrounds, and arenas used for the Missouri State Fair and various other events. The existing maintenance shops are located in multiple positions around the site and are in various stages of disrepair. 1.3 Owner's Objectives: The Owner's objective in performing the project is to provide MSF with a single centralized maintenance shop of adequate size and capability to house each of the maintenance departments: mechanics, electrical, plumbing, carpentry, and paint. In addition to the shops, the new facility will need to include a lobby and reception area as well as a conference room and facility manager's office. This project is expected to be completed in 12-14 months. The Design/Builder will be required to substantially complete the project no later than July 15, 2025. Question Deadline 04/15/2024 Questions, requests for clarification or requests for modification of the RFQ should be submitted in writing to Becky Mitchell at Becky.Mitchell@oa.mo.gov no later than the date specified in the Selection Schedule. Distribute Final RFQ Addendum April 16, 2024. The awarded Design/Builder shall be required to obtain MBE, WBE, SDVE participation in an amount equal to or greater than five percent (5) for Minority Business Enterprises (MBE), five percent (5%) for Women's Business Enterprises (WBE), and three percent (3%) for Service Disabled Veteran Enterprises (SDVE) unless a Good Faith Effort waiver is granted by the Owner. The Owner reserves the right to accept or reject a Betterment based on desirability, project needs and budget. The Owners reserves the right to accept or reject any Betterment without discussion.

Award

Playgrounds / Parks / Athletic Fields

$4,017,861.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
30
Bidding Soon
522
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

August 26, 2024

img_map_placeholder

2503 W 16th St, Sedalia, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.