BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Berkeley, California. Completed plans call for the renovation of a educational facility.

Deadline for questions: no later than 3:00p.m. Pacific, 03/28/2024. The University of California, Berkeley is seeking an Executive Architect to perform schematic design, design development, construction documents, permitting, bidding, construction administration and other support services as required by the Executive Design Professional Agreement (EDPA) for the renovations of three classrooms. These classrooms are McCone Hall Classroom 141, Valley Life Sciences Building (VLSB) 2050 and Physics 351. These projects are part of the General Assignment (GA) Classroom Renewal Program and are funded by the Capital Renewal Program. These programs fund projects that address general assignment teaching spaces with priority given to physical and technological upgrades and modernization of classrooms with the goal of renewing spaces on a 5 - 7-year cycle. McCone 141, VLSB 2050 and Physics 351are prioritized for renovation based upon: o Relative need for maintenance, renovation and upgrade. o Opportunity for upgrading classroom technology. o Opportunity to increase accessibility. o Opportunity to support new teaching pedagogy and provide active learning features. McCone Hall 141 McCone Hall, a 7-story building designed by John Carl Warnecke, was built in 1961 across from the Doe Memorial Library on the northern side of Memorial Glade and adjoined to the western side of Hesse Hall. The current classroom can accommodate 100 seats. A Conceptual study has been completed and is included (Attachment D) as part of the RFQ. The first phase of the architects' efforts will be to verify and confirm the program, scope and budget developed in the study. This will be used to guide the subsequent design phases and development of bidding documents. The project will consist of the architectural renovation of an existing classroom including accessibility improvements, seating replacement, finish upgrades, MEPFP upgrades, lighting upgrades, audiovisual technology integration and teaching wall improvements. VLSB 2050 The Valley Life Sciences Building (VLSB) was initially constructed in 1930 and was renovated approximately 60 years later as one of four building projects (Life Sciences Building, Life Sciences Addition, Genetics & Plant Biology Building, North West Animal Facility) undertaken to revitalize the biological sciences on the UC Berkeley Campus. VLSB currently accommodates 408 seats and is the fourth largest lecture hall on the UCB Campus. A Conceptual study is included (Attachment E) as part of the RFQ. The scope of work is expected to include accessibility upgrades, finishes upgrades, MEPFP upgrades, seating replacement, audiovisual technology integration and teaching wall improvements. The proposed accessibility upgrades include the addition of a raised floor in the lower tier of seating. Physics 351 The Physics Department is centrally located on campus, right along the Campanile Esplanade. Historic Physics South, Physics North, Birge Hall and New Campbell Hall (link is external), house physics labs, offices and classrooms. Physics 351 is located in the Physics North building and is currently used as a library and study space. A preliminary sketch of proposed modifications has been included (Attachment F). Further investigation and development will be required to arrive at a design. Due to the conversion from study space to classroom it is expected that the project may include finish upgrades, wall and door modifications, ceiling modifications, lighting upgrades, MEPFP modifications and audiovisual integration. In addition to the classroom scope of work listed above for McCone 141, VLSB 2050 and Physics 351, the architect will assess the path of travel to each classroom and accessible upgrades may be required. The project will be required to meet the University of California Sustainable Practices Policy as well as other relevant UC and campus policies and guidelines. The University, at its discretion, may decide to design and construct the projects concurrently or sequentially. The McCone 141 project is currently funded, and a preliminary schedule has been provided for this project for reference (Attachment C). The University may or may not move forward with VLSB 2050 and Physics 351 since these projects are not yet funded.

Post-Bid

Educational

$650,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
354
Active Projects
173
Bidding Soon
3,374
All Active Projects
1,338
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.