BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Vallejo, California. Contact the soliciting agency for additional information.

Services to be Provided. The work to be done consists of pavement striping services throughout the City of Vallejo. All Striping shall conform to the current standards of the California Department of Transportation Standard Plans and the California Manual on Uniform Traffic Control Devices. Work shall include the following: Install Work Site Safety and Traffic Control Measures: Before starting any work, traffic control plans shall be submitted and approved for each requested job. The contractor is responsible for providing all safety measures, including signs, cones, barriers and flaggers in the area of operation to ensure the safety of work personnel and the public. Site Inspection: Inspect areas where repairs are to be performed to ensure all surface bumps or defects are marked with washable paint to delimit the areas to be repaired. Preparation: The roadway surfaces to be striped or marked are to be broomed, swept, or blown to remove dirt, loose stones, or other foreign material prior to any painting operations. Additionally, temperatures and weather shall be taken into account and confirmed within specification for the materials being applied. Striping Measurement: Measurements shall be taken and agreed upon, in writing, by the field inspectors of City and Contractor during pre-job walks. Contractor will maintain records documenting such measurements. Application of Striping: The application of striping shall be agreed upon by the field inspectors of City and Contractor during pre-job walks and comply with City of Vallejo Pavement Painting, Striping, and Marking Standard Specifications. Contractor will maintain records documenting such measurements. Work Site: Contractor shall keep neat, tidy, and passable conditions of the work area during construction and abide by all regulations of the City of Vallejo. It shall be the responsibility of the contractor to repair any damage that is caused by its operation or negligence. Contractor and employees shall park vehicles and equipment in accordance with laws and ordinances of the City of Vallejo so as not to impede the free flow of traffic. Clean Up: All material or garbage shall be picked up by the operation crew and removed from the area at the end of each workday and the conclusion of the project. Online Q&A Yes Q&A Deadline 04/05/2024 2:00 PM (PDT) Pre-Bid Meeting No Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00%

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
47
Bidding Soon
1,813
All Active Projects
783
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 15, 2024

img_map_placeholder

Multiple Locations, Vallejo, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.