Site work and paving for a civil project in Hayward, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reference Number 0000347468 The Engineer's estimated cost of construction is $165,000.00 The work consists, in general, of drainage improvements in the form of creating a valley gutter at the intersection of Alves Street and Leighton Street to alleviate drainage issues during heavy storms. There will also be street pavement grading at the intersection including full width grinding, placing HMA overlay, adjusting utility frames and covers to grade, protecting existing curbs, and performing other items or details, not mentioned above, that are required by the plans, and as specified in the Standard Specifications or these Special Provisions. The Contractor shall pay to the City of Hayward the sum of $500.00 per day in excess of the number of working days prescribed above, for each and every calendar day's delay in finishing the work. See details in the Special Provisions. At the time this contract is awarded, the Contractor shall possess a Class A or a combination of any of the following license classifications which constitute a majority of the work: C-8 and C-12 license. General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Prevailing Wage Required - Warranty Information Required Each bid must be accompanied by certified or cashier's check, or bidder's bond duly executed by a responsible corporate surety authorized to issue such bonds in the State of California, made payable to the City of Hayward for an amount equal to at least ten (10) percent of the amount bid. Bonding Requirements - Bid Bond 10 % -- The successful bidder shall furnish a Labor and Materials Bond and a Faithful Performance Bond. Each Bond shall be for 110% of the bid amount , The Contractor may elect to receive 100 percent of payments due under the contract from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Sections 22300 of the Public Contract Code Question Deadline 04/11/2024 at 4:00 PM PT submit questions in writing, via e-mail, to Kevin.Yoshiki@haywardca.gov . The work is to be completed within thirty (30) working days.

Award

Water / Sewer

$132,250.00

Public - City

Paving, Site Work

6

7

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
90
Bidding Soon
1,901
All Active Projects
772
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

Leighton St & Alves St, Hayward, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.