BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Palm Desert, California. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

CVWD's Engineering Department is requesting formal proposals from Respondents to prepare final plans, specifications, and cost estimates for the Valley View Trunk Sewer Design (Project). The Project work scope includes utility research, survey, potholing, right-of-way research and acquisition of necessary pipeline easements, fee title and temporary construction easements (TCE) if applicable (including preparation of legal descriptions and plats), geotechnical services, identification of alternatives and preferred pipeline alignments, final design documents, specifications, cost estimates, and permits for: 1. Proposed offsite improvements include a new sewer lift station (750 gpm firm capacity), 1,250 linear feet of 6-inch forcemain, 14,200 linear feet of 8-inch and 1,420 linear feet of 10-inch diameter gravity sewer pipeline along portions of Soto Street, Airport Blvd. The 6-inch forcemain will connect to CVWD's existing 10-inch gravity sewer pipeline at the intersection of Grapefruit and Avenue 57. This system is expected to include 44 manholes. Please refer to the attached exhibit for the project limits. 2. A new sewage lift station would be constructed at the southwest parcel of Desert Cactus Drive and Avenue 57th. From there 1,250 linear feet of 6-inch diameter force main would be constructed to the connection point on Grapefruit Blvd and Avenue 57. The design effort needs to include onsite improvements and laterals needed to convey flows from Desert View Mobile Home Park, Magdaleno Lopez Mobile Home Park, Campos Mobile Home Park, Meza's Ranch, Rodriguez' Ranch, Villa De Josue Mobile Home Park. Valley View Mobile Home Park, Leon Housing, Durans Farms, Oscar Cruz Water System, Luciano Valenzuela, Vista Norte Estates, De Leon Ranch, and Soto Water to the offsite sewer main. Approximately 6,175 feet of onsite pipelines for these 14 mobile home park to connect to the offsite sewer system. Onsite improvements also includes abandonment of 28 septic tanks. Please refer to the attached exhibit for the project limits. Q&A Deadline 04/19/2024 4:00 PM (PDT) Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Start/Delivery Date Anticipated Start Date of May 15, 2024 Project Duration Anticipated Completion Date of June 30, 2025 License Requirements Civil Engineering / Professional Engineering The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$500,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
45
Bidding Soon
879
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.