Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 29, 2024 at 8:00 PM
Updated May 30, 2024
Site work for a road / highway in Palmerton, Illinois. Completed plans call for site work for a road / highway.
As of May 3, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Work covered by this section of the Specifications involves the replacement of the existing traffic signal located at the intersection of Delaware Avenue (S. R. 2002) and Third Street in the Borough of Palmerton with a new traffic signal. The intersection improvements include new traffic signals, new controller cabinet and pedestrian facilities, new signage, line striping and both concrete and brick sidewalk removal and replacement as shown on the traffic signal permit plans and construction plans. Palmerton Borough will receive sealed bids for Delaware Avenue and Third Street Traffic Signal Replacement project. Questions and inquiries should be addressed Electronically Each bid must be accompanied by Bid Security made payable to the Owner(s) in an amount of ten percent (10%) of the total Bid price and in the form of a certified or bank check or a Bid Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions The Successful Bidder must furnish Performance, Payment Bonds and Insurance Per Contract and meeting the requirements of Paragraph 6.01 of General Conditions. This project is subject to minimum wage rates in accordance with the applicable provisions of the Pennsylvania Prevailing Wage Act and the Public Works Employee Verification Act. Bidders must be PennDOT Prequalified per PennDOT Pub. 408 Section 102 The Owner reserves the right to waive any informality in, and/or to reject, any or all bids. No bid will be accepted if obtained from sources other than the issuing office noted above Improvements include new traffic signals, new controller cabinet, pedestrian signals, new signage, line striping, and both concrete and brick sidewalk removal and replacement. Question Deadline 04/10/2024
Award
Roads / Highways
$483,215.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 19, 2024
May 27, 2024
Multiple Locations, Palmerton, IL
Related To This Project
Channahon, IL
Bid Date: Apr 12 2024
Washington, IL
Bid Date: Apr 15 2024
Chicago, IL
Bid Date: Apr 18 2024
Romeoville, IL
Bid Date: Apr 17 2024
Manhattan, IL
Bid Date: Apr 17 2024
Wilmington, IL
Bid Date: Apr 17 2024
Will Township, IL
Bid Date: Apr 17 2024
Frankfort, IL
Bid Date: Apr 17 2024
Lemont, IL
Bid Date: Apr 17 2024
Taylorville, IL
Bid Date: Apr 03 2024
Rockford, IL
Bid Date: Apr 30 2024
Peoria Heights, IL
Bid Date: May 07 2025
Peoria Heights, IL
Bid Date: May 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
