BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2024 at 8:00 PM

Updated May 8, 2024

Site work and paving for a road / highway in Tuscaloosa, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For construction of the University Blvd Infrastructure Improvements Hackberry to 6th Ave Phase C, Prequalification submissions must be received by 5:00 PM local time Tuesday, April 9, 2024 For questions regarding this project, please contact UA Project Manager David Welch at 205-348-8843 or dcwelch1@ua.edu All questions regarding this procedure shall be directed to the University of Alabama Inspection Coordinator (UA IC), Alison Hewson (205) 348-1684. All correspondence regarding this procedure shall be copied to the UA IC at ahewson@ua.edu

Bid Results

Roads / Highways

$885,043.00

Public - State/Provincial

Paving, Site Work

36

13

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
67
Bidding Soon
607
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 27, 2024

Project location map

University Blvd, Tuscaloosa, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.