Site work and paving for a mixed-use development in Eden Prairie, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Site Directions: In Carver and Hennepin Counties on TH 101 from TH 5 to 500 Ft S. of CSAH 62/Townline RD Description: Grading, Bituminous Mill and Overlay, ADA Improvements, Bituminous Trail, Signal Revisions, and Pedestrian Crosswalk Flasher System Additional Description: DBE 17.3 32% Min. 20% Women Start 6/10/24 End 6/30/25 MN DOT: 054 - Grading, Bituminous Mill and Overlay, ADA Improvements, Bituminous Trail, Signal Revisions, and Pedestrian Crosswalk Flasher System The provisions established in this document do not necessarily represent all federal, state, and local laws, ordinances, rules and regulations. It is the responsibility ofthe prime contractor to inform itself and all subcontractors about other regulations that may be applicable to this contract. K. Second Tier Subcontractor: An individual, firm, corporation, or other entity to which a first tier subcontractor sublets part ofthe contract. N. Subcontractor: An individual, firm, corporation, or other entity to which the prime contractor or subcontractor sublets part ofthe contract. M. Specifications: A general term applied to all directions, provisions, and requirements pertaining to performance ofthe work. L. Special Provisions: Additions and revisions to the standard and supplemental specifications covering conditions peculiar to an individual project. B. These provisions shall apply to the prime contractor and all subcontractors contracting to do all or part ofthe work under this contract.11 O. Substantially In Place: Mineral aggregate is deposited on the project site directly or through spreaders where it can be spread from or compacted at the location where it was deposited.6 A. These provisions shall apply to this contract, which is funded in whole or in part with federal funds9 and state funds.10 Q. Trucking Firm/Multiple Truck Owner (MTO): Any business entity that owns more than one vehicle and hires the vehicles out for services to brokers or contractors on public works8 projects. D. The prime contractor is responsible to ensure that each subcontractor performing work under this contract receives copies of all required contract provisions.12 These provisions shall be incorporated into written subcontracts and must be displayed on the poster board.13 P. Trucking Broker: An individual or business entity, the activities ofwhich include, but are not limited to: contracting to provide trucking services in the construction industry to users ofsuch services, contracting to obtain such services from providers oftrucking services, dispatching the providers ofthe services to do work as required by the users ofthe services, receiving payment from the users in consideration ofthe trucking services provided and making payment to the providers for the services.78 J. Project: The specific section ofthe highway, the location, or the type ofwork together with all appurtenances and construction to be performed under the contract. HI. S Project no- 1010-10 (TH 101=187), SAP 194-010-017, STBG 2724(090)

Award

Roads / Highways

$3,450,450.00

Public - State/Provincial

Paving, Site Work

260

4

4

9

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
70
Bidding Soon
1,647
All Active Projects
565
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 26, 2024

June 10, 2024

July 1, 2025

img_map_placeholder

MN-101, Eden Prairie, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.