BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 5, 2026

Site work and paving for a bridge / tunnel in Pointe-Claire, Quebec. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction of a multi-use pedestrian and cycling over Highway 40 (Félix-Leclerc) near Saint-Jean Boulevard in Pointe-Claire. The new structure will follow the axis of the Saint-Jean Boulevard. Value of the project is expected to be as high as $10 million. TIMELINE: Due to funding constraints and prioritization of other construction project this project was cancelled by the owner. Construction will not proceed. Coverage of this report has been discontinued.

Project Abandoned

Bridges / Tunnels

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
646
Active Projects
263
Bidding Soon
3,579
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2027

Project location map

Boul. Saint-Jean, Pointe-Claire, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.