BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Fort Smith, Arkansas. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

The City Of Fort Smith Reserves The Right To Reject Any Or All Bids And Waive Formalities. For The Demolition Of Buildings 3107 Stanard Ave, W 36 Lot 10 & E 45 Lot 11, Blk. A; Brentwood Addition, Parcel 10843-0011-00001-00 The City of Fort Smith is seeking bids from qualified, City-licensed demolition firms, hereinafter referred to as "Contractor," to provide demolition and disposal of designated substandard and condemned site(s) as indicated in this bid document (See "Demolition & Pricing List"). These services shall be in accordance with the terms, conditions, and specifications contained in this bid document. Services required shall include and incorporate the demolition and disposal of the said structure(s), removal of footings, slabs, asphalt pavement, walkways, miscellaneous structures, debris, and other undesirable objects. The price listed shall include all costs associated with the performance of the services specified, including overhead, labor, materials, equipment, tools, transportation, and all other costs incidental to complete demolition and removal of the structures indicated, including the removal and cleanup of any known asbestos, the removal of any concrete foundation walls, footings, floors, etc., and the hauling and placing of any fill material which may be required to fill remaining voids. 1. Actual demolition shall incorporate the removal of all structures to include residential, outbuildings, sheds, and other miscellaneous structures so designated by the City. 2. Removal of all foundations, footings, slabs, asphalt walkways and driveways, debris, and other undesirable objects to the sidewalk. Care shall be taken not to damage the sidewalks or street. Any damage shall be the responsibility of the Contractor. 3. Septic systems (if applicable) shall be pumped until empty, remove and dispose of tanks, and fill in void with clean fill. All sanitary sewer lines connected to street sewer main lines shall be capped off. Areas shall be filled to grade and shall match elevation to adjoining property. 4. Foundation landscaping shall be removed unless otherwise designated. Dead trees shall be removed and the contractor shall provide fill and refill the excavated site to a level even with the surrounding area. 5. The area shall be filled with clean fill and graded to a uniform and well-drained finish. All filled areas shall be compacted and the entire area shall be left well drained by grading to existing drain areas. Fill materials shall be free from matter subject to deterioration. 6. Contact all required utility companies to disconnect services from project area and all lines are removed from the property. Water & Sewer lines shall be capped at the property line. 7. All work and equipment shall be strictly confined to lot boundaries. 8. Access to the job site shall be from existing streets bordering the work and the employee parking shall be on the job site or on streets bordering the lot. 9. While on the job site, all parties shall conduct themselves in a professional manner; no consumption of alcoholic beverages, no loud music, no profanity, no littering, and the job site shall be left clean and neat at the end of each day with equipment stored neatly on the job site. 10. Use of heavy equipment and other loud equipment or hammering shall not begin prior to 7:00 a.m. and must cease by 6:00 p.m. No Sunday work shall be allowed. 11. All materials shall be disposed of at Contractor's expense in an approved landfill area. Debris removal shall be accomplished with neatness and without debris trails on streets. No material may be burned or buried on site. 12. Any reported damage to other lots, rights of way, roads or the property of others caused as a result of structural removal shall be the responsibility of the Contractor. All work must be completed within forty-five (45) days

Award

Municipal

$4,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
39
Bidding Soon
480
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2024

May 8, 2024

img_map_placeholder

3107 Stanard Ave, Fort Smith, AR


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.