BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Muncie, Indiana. Completed plans call for the renovation of a library.

Scope of Work to include, but not limited to: Work of this project includes repairs to the brick masonry exterior and portions of the roof of Bracken Library. Work generally includes tuckpointing, flashing installation in brick masonry, roof membrane removal and installation, the installation of and aluminum coping cap, and other work procedures. Bids shall be properly executed, addressed to Ball State University Board of Trustees, submitted on Contractors Bid For Public Works Form 96 (revised 2013), as prescribed by the Indiana State Board of Accounts giving financial data as recent as possible and in no event older than 90 days. Each Bid must be accompanied by the contractor's Minority, Women's, and Veteran Business Participation Plan, advising whether, and if so how the contractor will utilize Minority, Women's and Veteran owned enterprises as subcontractors or material suppliers on the project. Each bid shall be accompanied by a certified check or bank draft, made payable to the order of Alan Finn, Vice President for Business Affairs and Treasurer for Ball State University, Muncie, Indiana, or by an acceptable bidder's bond for an amount not less than 5 percent of the total bid price. The Contract shall be awarded in accordance with the provisions of IC 5-16-13. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference in each public works contract and Contractor agrees that pursuant to IC 5-16-13- 8 the public works project will not be structured other than in the contractor tier structure required by law. Contractor shall be required to comply in all respects with the provisions of IC 5-16-13 commencing with public works contracts, including but not limited to training programs, document preservation and availability of inspection and suspected worker misclassification procedures which commence with public works contracts. The provisions pursuant to IC 5- 16-13-10 (c), public works contracts commencing after December 30, 2016 include requirements for prequalification by the Indiana Department of Administration (IDOA). In accordance with IC 22-5-1.7-11.1, Contractors entering into a contract with the Owner will be required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify Program and execute an affidavit certifying compliance with the law in the form included in the Contract Documents. DOA) INDIANA DEPARTMENT OF ADMINISTRATION GOALS: MBE 6% WBE 7% VBE 3%

Award

Library

$278,465.00

Public - State/Provincial

Renovation

9

13

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
97
Bidding Soon
1,238
All Active Projects
555
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

May 6, 2024

img_map_placeholder

2000 W University Ave, Muncie, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.