Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Rockford, Illinois. Completed plans call for site work for a water / sewer project.
Questions Interested parties may direct questions in writing concerning this Request for Proposals or for specific details to Ed Fitzgerald at efitzgerald@fourrivers.illinois. The Authority will not interpret specifications for individual proposers. If the Authority determines that the specifications need to be clarified or revised, it will issue an addendum to all prospective proposers. RFP SCOPE The scope of this RFP involves providing all labor, tools, material, equipment and permits necessary for a complete working system: 1) The purchase and installation of a single 22,000 gallon underground (3) compartment double-walled fiberglass fuel tank* (10k/6k/6k) a.* See Section III, Detail Specifications, Division 33-Utilities, Section 35616 Underground Fuel Storage Tanks. 2) (1) 500 gallon aboveground Diesel Exhaust Fluid (DEF) tank and dispenser w/hose retractor 3) A 9'x16' control building (climate controlled) 4) A canopy over the fuel island (approximately 36'x48') 5) All associated site work and equipment necessary for a working system. 6) The fuel islands shall consist of: a.Owner purchased Assetworks fuel management system, (2) consoles, (1) on each island (Owner purchased, Contractor coordinated and installed). b.(2) Unleaded single hose dispensers and (2) dual hose dispensers. Each dual hose dispenser shall dispense both On-road Diesel and Off-road Diesel. 7) The removal of (3) underground fuel tanks (10k/10k/4k) and related equipment including the restoration of the site No materials or equipment to be reused. a.New fuel island must be installed and able to dispense fuel prior to beginning tank removal. Owner will remove all possible fuel prior to contractor beginning tank removal. 8) Any dewatering shall be included and the new tank shall be anchored by deadman furnished and installed by Contractor. All work shall be in compliance with all Federal, State and Local laws. Contractor shall obtain all permits and obtain any drawings necessary at Contractors expense Note: 1) The following detailed specifications are the minimum required specifications. Some sections may contain items that are not applicable to this project. Any changes or substitutions must be agreed upon in writing. 2) Any references to "IDOT Standard Specifications" are IDOT Standard Specifications for Road and Bridge Construction, Adopted January 1, 2022 and Supplemental Specifications and recurring special provisions, adopted January 1, 2024. 3) The brick/block for the Control Building is to match adjacent Collection Systems Facility: a. Split Face CMU: Trenwyth "Butterfield" (with Dry-Blok in CMU and Mortar) b. Indiana Cast Stone "Buff" c. Bowerston #85/15 Vertical Matt Modular Question Deadline 04/24/2024 Interested parties may direct questions in writing concerning this Request for Proposals or for specific details to Ed Fitzgerald at efitzgerald@fourrivers.illinois. The Authority will not interpret specifications for individual proposers. If the Authority determines that the specifications need to be clarified or revised, it will issue an addendum to all prospective proposers.
Post-Bid
Water / Sewer
$77,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2024
June 7, 2024
To Be Determined, Rockford, IL
Related To This Project
Rockford, IL
Bid Date: Apr 09 2024
Rockford, IL
Bid Date: Apr 26 2024
Rockford, IL
Bid Date: May 02 2024
Rockford, IL
--
Rockford, IL
Bid Date: May 07 2024
Rockford, IL
Bid Date: Apr 25 2024
Rockford, IL
Bid Date: Apr 30 2024
Rockford, IL
Bid Date: May 14 2024
Rockford, IL
Bid Date: May 08 2024
Rockford, IL
Bid Date: Apr 30 2024
Rockford, IL
Bid Date: Apr 16 2024
Rockford, IL
Bid Date: Jul 02 2024
Rockford, IL
Bid Date: Apr 16 2024
Rockford, IL
Bid Date: Apr 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.