Site work for a water / sewer project in Mobile, Alabama. Completed plans call for site work for a water / sewer project.

WORK COVERED BY THE CONTRACT DOCUMENTS The work consists of the following: 1. Mobilization of supplies, equipment, and personnel to site for project execution. 2. Removal & Disposal of damaged timbers, steel wale, and mounting hardware on face of Pier 8 as specified in the attached pictures and scope of work. 3. Remove & Reinstall existing rubber fender elements and hardware. 4. Remove & Reinstall undamaged timbers and Replace hardware. 5. Furnish & Install steel wale and mounting hardware as specified in the attached pictures and scope of work. 6. Furnish & Install 12"x12" timbers and mounting hardware as specified in the attached pictures and scope of work. 7. Furnish & Install 6"x8" timbers and mounting hardware as specified in the attached pictures and scope of work. 8. Demobilization from site This requisition solicits proposals for construction services to remove and replace damaged elements of the Pier 8 fender system as specified in the attached pictures, drawing, and scope of work. All work shall be in accordance with the requirements stated herein, Scope of Work Specifications, Reference documents and drawings, Insurance Requirements and applicable State of Alabama and Federal Laws. The project site is located at Pier 8 on the Alabama State Port Authority Main Docks facility in Mobile, AL. The work consists principally of providing bonds, labor, materials, equipment, insurance, and supervision necessary for the removal of damaged elements of fender system, purchase and installation of new fender system components and disposal of all removed materials associated with the work. The project includes, but is not limited to, the purchase and installation of 12"X12" timbers, 6"X8" timbers, HP10x42 steel wale, bolts, and all associated hardware. All materials, labor, tools, rigging and equipment necessary to perform the work shall be included by the Contractor in the proposal. It is the Contractor's responsibility to field verify all dimensions and site conditions essential for the successful completion of the work. The Contractor shall not be entitled to any additional compensation for any work or expense resulting from the neglect of verifying all existing site conditions. Bid proposals must be submitted in sealed envelopes with the words "Bid Document Enclosed" clearly marked on the outside of the envelope. Sealed bids shall have the bidder's name, contractor's license number, project name, and time and date of bid opening shown on the outside of the envelope. A Bid Bond or Certified Check made payable to the Alabama State Port Authority and equal to five percent (5%) of the amount bid, not to exceed $10,000, must accompany the Bid Proposal. Authority reserves the right to refuse to issue a proposal form or a contract to a prospective bidder for any of the following reasons: a) Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contract in force with the Authority. b) Contractor default under previous Contract with the Authority. c) Proposal withdrawal or Bid Bond forfeiture on previous project with the Authority. d) Unsatisfactory work on previous contract with the Authority. e) Lack of competency, past experience, adequate machinery or lack of personnel. Any questions regarding the procurement should be directed to Matthew Thomas, P.E., Project Manager, at phone number (251) 441-7242 or email matthew.thomas@alports.com. The right is reserved, as the interest of the Alabama State Port Authority may require, to reject any and all bids and to waive informalities in bids received. The work performed under this contract shall not commence until the Contractor has submitted a Performance Bond, Labor & Material Bond, and Certificate of Insurance in an acceptable form. Performance Bond and Labor & Material Bonds shall be in an amount equal to 100% of the contract price; Certificate of Insurance shall be as per the attached requirements and countersigned by a licensed resident agent in the State of Alabama. The Contractor will be required to complete the work under the Contract within 150 calendar days after receipt of a "Notice to Proceed". Work will start and the Contractor will be required to furnish proof of purchase of materials and a construction schedule within 10 calendar days after receipt of notice to proceed. The work will have to be scheduled and performed in a manner that will not interfere with the operations of the facility ongoing in the immediate and adjacent areas. ASPA intent is that work hours will be during normal day light hours

Award

Water / Sewer

$24,850.00

Public - State/Provincial

Site Work

6

3

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
33
Bidding Soon
486
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

June 3, 2024

img_map_placeholder

900 Alabama State Docks Blvd, Mobile, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.