BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Cheyenne, Wyoming. Working plans call for site work for a road / highway; and for paving for a road / highway.

“The owner has selected a Design Builder. A timeline for construction has not yet been established. The Consultant/Contractor shall design a trail system consisting of approximately 6.5 miles of new natural tread multi-use nonmotorized trails designed for Hikers and Mountain Bikers. The trail width will be 24 to 30 inches with a low maintenance sustainable tread design. The trail system shall be configured, developed, and constructed as a stacked loop system. Trail design and construction shall adhere to the IMBA Trail Solutions standards. Trails will be designed and built to accommodate users with an intermediate fitness level and beginner to intermediate mountain bike skills. This project does include a short segment of trail that will require advanced mountain bike skills. The project will also include signposts and navigational sign placement at all trail intersections. Directional/location signs will be supplied by the City of Cheyenne. Trail design must incorporate adequate grade reversals for trails to properly drain and shed water. Wherever possible, trails should be located and constructed on rock exposures and soils that support sustainability and reduce maintenance. Sustainability components should include: Support of current and future use with minimal impact to the area's natural systems. Produce negligible soil erosion, loss, or movement while allowing vegetation to inhabit the area. Does not adversely affect the area's animal life. Accommodate existing use while allowing only appropriate future use. Careful trail design that eliminates or minimizes future trail rerouting. Minimizes long-term maintenance. Question Submission Deadline April 17, 2024, 5:00pm The City of Cheyenne, Wyoming, hereby requests proposals for the Belvoir Ranch Phase 2, Design-Build Trail. *The value for this project is based on a financial range of $200,000 - $300,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Pre-Construction/Negotiated

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

3

5

4

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
19
Bidding Soon
345
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

May 31, 2024

img_map_placeholder

To Be Determined, Cheyenne, WY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.