BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work and paving for a road / highway in Cheyenne, Wyoming. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of May 2, construction began in Spring 2024 and is expected to be complete by June 2025. The Consultant/Contractor shall design a trail system consisting of approximately 6.5 miles of new natural tread multi-use nonmotorized trails designed for Hikers and Mountain Bikers. The trail width will be 24 to 30 inches with a low maintenance sustainable tread design. The trail system shall be configured, developed, and constructed as a stacked loop system. Trail design and construction shall adhere to the IMBA Trail Solutions standards. Trails will be designed and built to accommodate users with an intermediate fitness level and beginner to intermediate mountain bike skills. This project does include a short segment of trail that will require advanced mountain bike skills. The project will also include signposts and navigational sign placement at all trail intersections. Directional/location signs will be supplied by the City of Cheyenne. Trail design must incorporate adequate grade reversals for trails to properly drain and shed water. Wherever possible, trails should be located and constructed on rock exposures and soils that support sustainability and reduce maintenance. Sustainability components should include: Support of current and future use with minimal impact to the area's natural systems. Produce negligible soil erosion, loss, or movement while allowing vegetation to inhabit the area. Does not adversely affect the area's animal life. Accommodate existing use while allowing only appropriate future use. Careful trail design that eliminates or minimizes future trail rerouting. Minimizes long-term maintenance. Question Submission Deadline April 17, 2024, 5:00pm The City of Cheyenne, Wyoming, hereby requests proposals for the Belvoir Ranch Phase 2, Design-Build Trail. *The value for this project is based on a financial range of $200,000 - $300,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Under Construction

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

3

5

4

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
22
Bidding Soon
513
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

May 27, 2024

Project location map

To Be Determined, Cheyenne, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.