Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Morenci, Arizona. Completed plans call for the renovation of a educational facility.
Summary Morenci Unified School District, #18 is in Greenlee County serving our K-12 Community. This Project will be funded by the Division of School Facilities. This is a project is for Exterior Door Replacement at Morenci High School. Question Submission Deadline:April 23, 2024, 12:00pm Construction Scope of Work 7.1. General Information Morenci Unified School District, #18 in Greenlee County. This Project will be funded by the Division of School Facilities. 7.2. Specifications Specifications are designed to enable bidder to convey the requirements for a product, material, process, or service. A specification may be expressed as a standard, part of a standard, or independent of a standard. No specification is intended to limit competition by eliminating items capable of satisfactorily meeting the requirements of this procurement. If bidder believes a specification is unnecessarily restrictive, bidder must indicate in the deviations and exceptions section of your response. 7.3. Required General Contractor License Bidder certifies that Bidder is aware that the Contract cannot be awarded to Bidder unless, at the time of the submitting a bid, he/she is the holder of a valid Arizona Contractor's License proper and adequate for the work required by the Contract, and that the failure to obtain proper and adequate licensing for an award of the Contract shall result in the forfeiture of the Bidder's Security. If you subcontract any work, you must also have that type of license, or have a KB-1 or KB-2. 7.4. Required Subcontractor License Bidder certifies that Bidder is aware that the Contract cannot be awarded to Bidder unless, at the time of the submitting a bid, all subcontractors' hold of a valid Arizona Contractor's License proper and adequate for the work required by the Contract. 7.5. Labor and Materials Unless otherwise indicated, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, facilities and services necessary for the proper execution and completion of the Work. The Contractor shall enforce strict discipline and good order among his employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit person(s) not skilled in the task assigned to them. 7.6. Protection of Work and Rain Protection of Existing Structures Contractor shall provide all protection required to ensure that all completed work and all existing construction will not be subject to weather damage. The Contractor may at his option and expense install any lawful security measures he deems necessary to protect his materials, equipment or finished work. Type of security devices or quantity shall be the sole responsibility of the Contractor. The Contractor is to provide security and protect the project until MUSD has occupied the space or Morenci Unified School District, #18 has accepted the space. Protection: The Contractor shall be responsible for the protection of all materials and work. The Contractor shall include in his proposal the cost of any temporary sheathing, plastic covering, etc., as may be required to protect affected areas. Remove all such temporary work at the proper time during the construction period and repair all damage related to same. The Contractor is responsible for the protection of the area in which work is being performed. Contractor shall manage a sequence of work in regard to demolition and removal of existing roofing and installation of new decking and roofing so that existing interior spaces are protected from weather damage, including wind, sun and rain. 7.7. Temporary Facilities Sanitary Facilities: Provide temporary toilets, wash facilities, safety shower and eyewash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities have jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities. Protection of Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Morenci High School and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities. Site Enclosure Fencing: Before construction operations begin, furnish and install site enclosure fence in a manner that will prevent people from easily entering the site except by entrance gates. Maintain security by limiting the number of keys and restricting distribution to authorized personnel. Security Enclosure and Lockup: install temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security. Lock entrances at the end of each workday. Barricades, warning signs, and lights: Comply with requirements of authorities have jurisdiction for erecting structurally adequate barricades, including warning signs, and lighting.
Award
Educational
$180,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2024
June 10, 2024
473 Stadium Dr, Morenci, AZ
Related To This Project
Morenci, AZ
Bid Date: Apr 12 2024
Morenci, AZ
Bid Date: Feb 09 2024
Morenci, AZ
Bid Date: Aug 04 2023
Morenci, AZ
Bid Date: May 26 2022
Phoenix, AZ
Bid Date: Apr 23 2024
Window Rock, AZ
Bid Date: Apr 26 2024
Dilkon, AZ
Bid Date: Apr 25 2024
DM AFB, AZ
Bid Date: Apr 15 2024
Flagstaff, AZ
Bid Date: May 15 2024
Phoenix, AZ
Bid Date: Apr 19 2024
Black Canyon City, AZ
Bid Date: May 02 2024
Casa Grande, AZ
--
Scottsdale, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.