Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Germantown, Tennessee. Completed plans call for site work for a water / sewer project.
As of May 28, 2024, This project was awarded to Enscor, LLC, awarded amount is $465,817.50. The work required under this Contract includes furnishing and paying for all necessary materials, labor, tools, equipment, and other items and construction improvements of Allenby Lake Berm and Outlet/Stream Reconstruction, complete in every detail, ready for the City's beneficial use as specified herein and/or indicated on the contract drawings. The work will begin at Wolf River Boulevard Opposite Allenby Lake, Germantown, Tennessee. PROJECT DESCRIPTION Project information was obtained from Mr. Hooper. We have also been furnished with site plans entitled SITE DEVELOPMENT CONSTRUCTION DRAWINGS, ALLENBY LAKES DRAINAGE IMPROVEMENTS, Germantown Tennessee dated April 24, 2018. The improvements will consist of the construction of a new pond outlet structure and four drop structures along a newly developed drainage feature leading from Allenby Lake to an unnamed tributary of the Wolf River. We have been requested to provide soil parameters and geotechnical related recommendations for the design of the proposed structures. The geotechnical recommendations presented in this report are based on the available project information, structure locations, and the subsurface materials described in this report. If the noted information is incorrect, please inform PSI in writing so that we may amend the recommendations presented in this data report if appropriate and if desired by the client. PSI will not be responsible for the implementation of its recommendations when it is not notified of changes in the project.
Award
Water / Sewer
$465,818.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2024
May 23, 2024
Allenby Lakes Dr, Germantown, TN
Related To This Project
Germantown, TN
Bid Date: Apr 22 2024
Germantown, TN
Bid Date: Apr 08 2024
Germantown, TN
Bid Date: Apr 30 2024
Germantown, TN
Bid Date: May 09 2024
Germantown, TN
Bid Date: May 15 2024
Germantown, TN
Bid Date: May 06 2024
Germantown, TN
Bid Date: May 07 2024
Germantown, TN
Bid Date: Apr 23 2024
Germantown, TN
--
Germantown, TN
--
Germantown, TN
Bid Date: Apr 02 2024
Germantown, TN
Bid Date: Mar 26 2024
Germantown, TN
Bid Date: Mar 26 2024
Germantown, TN
Bid Date: Mar 27 2024
Rehabilitation of Pipeline Cured-In-Place Pipe (CIPP) 36" Outfall Line (Allenby-Kimbrough) - 5312297
Germantown, TN
Bid Date: Apr 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.