BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Greenville, Mississippi. Completed plans call for site work for a water / sewer project.

Below work will be completed onboard CGC PATOKAs shore facility 1. Contractor shall provide ALL labor and materials necessary to complete the project. 2. Contractor shall comply with submittal requirements if applicable. 3. Contractor shall protect all equipment and merchandise in work locations. 4. Contractor shall replace approximately 150 ft of sewage piping and fitting at the pier. (see figure 3) 5. Contractor shall replace approximately 150 ft of potable water piping and fitting at the pier. (see figure 3) 6. Contractor shall replace insulation and heater strips on the piping system at the pier. 7. Contractor shall ensure the new potable water system and sewage system at the pier is fully operations. Coast Guard COR must be present during the testing of both systems. 8. Contractor shall ensure the new heating strips are operational. Coast Guard COR must be present during the testing of the heating strips. 9. Contractor shall be responsible for the removal of all trash and debris from project area upon completion. 10. All work must be approved by the Contracting Officer's Representative This is a combined synopsis / solicitation to repair the sewage and potable water piping system on the pier of the USCGC PATOKA. All work to be completed according to the attached Statement of Work (SOW). A Firm Fixed Price Construction Order will be issued to the contractor with the lowest priced quote. All contractors must be actively registered in Sam.gov NAICS: 238220 Size Standard: $19,000,000 PSC Code: Z2NE Place of performance is USCGC PATOKA 1797 Harbor Front Road Greenville, MS 38701 Period of performance is May 13th through May 24th, 2024. The period of performance is negotiable. Federal Acquisition Regulations and Department of Labor Wage Determination MS20240046 are attached and are applicable. Site visits are strongly encouraged before submitting quotes. Site visits can be scheduled with Chief Jacob Newland. Jacob.M.Newland@uscg.mil (662)394-9746. Payment and performance bonds are not required. Please submit your quote by 3:30 PM CST April 26th, 2024 to sterling.t.davis@uscg.mil

Post-Bid

Water / Sewer

$250,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
13
Bidding Soon
214
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

May 13, 2024

img_map_placeholder

1797 Harbor Front Rd, Greenville, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.