BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2024 at 8:00 PM

Updated May 11, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Linn Creek, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.

The proposed work includes the construction of a 70-0 long, single span, 40 degree RA skew and 1.20% grade, concrete deck, steel I-girders, and concrete abutments on driven steel H-Piles located on County Road 303, over Linn Creek in Osage County MO. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction. The contractor questionnaire must be on file 7 days prior to bid opening Any questions regarding the project, plans, specifications, or bid documents should be directed to Aaron McVicker of McClure, at 660-415-4007 A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The Owner, however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in his interest. The DBE Goal for this project is 5%. No 2nd tier subcontracting will be allowed on this project. MODOT - Osage County Bridge Replacement

Bid Results

Bridges / Tunnels

$400,345.00

Public - County

Demolition, New Construction, Paving, Site Work

23

11

5

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
40
Bidding Soon
601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

July 8, 2024

Project location map

County Road 303, Linn Creek, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.