BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Site work for a mixed-use development in West Kelowna, British Columbia. Conceptual plans call for site work for a recreation facility; fire / police facility; municipal facility; and water / sewer project.

Through this Request for Proposals, the City of West Kelowna is seeking qualified electrical contractors to conduct a multi-part facility upgrade to facilitate the upgrades and infrastructure additions for level II vehicle charging stations at 5 City facilities. This is a design/build generated by previously completed Fleet Energy Assessment prepared for the City by Charge FWD and supported by BC Hydro, see attached Report. The 5 facilities include: 1. The Mt. Boucherie Complex 2760 Cameron Rd. 2. City Hall 3731 Old Okanagan Hwy. 3. Operations Centre 2515 Bartley Rd. 4. Powers Creek Water Treatment Plant 3184 Shetler Dr. 5. Fire House #30 2406 Drought Rd. Documents can be obtained from https://westkelowna.bidsandtenders.ca/ Cancelled.

Project Abandoned

Municipal

$500,000.00

Public - City

Site Work

31

9

16

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
17
Bidding Soon
309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

March 1, 2026

Project location map

Multiple Locations, West Kelowna, BC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.