Published May 15, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Florham Park, New Jersey. Completed plans call for site work for a water / sewer project.

The Project consists of demolition of the existing Bar Screen, supply and installation of a new Mechanical Bar Screen and other work as shown, specified or required at the Water Pollution Control Facility. All work on this contract must be substantially completed within 360 calendar days and fully completed within 390 calendar days from issuance of a Notice to Proceed. Proposals must be made on and in the same order as the standard proposal forms included with the Contract Documents in the manner designated in the Contract Documents, must be enclosed in sealed envelopes bearing the name and address of the bidder and the name of the project on the outside and be addressed to the Clerk of Borough of Florham Park at the Borough Hall address above. Sealed bids must be accompanied by a statement of consent of surety from a surety company authorized to do business in the State of New Jersey and acceptable to the Owner and either a bid bond or a certified check drawn to the order of Borough of Florham Park for not less than ten percent (10%) of the amount bid, except that the check shall not exceed $20,000.00. The successful bidder is hereby notified that a performance bond and labor and material (payment) bond for the full amount of this project is required. Bidders are notified that they must comply with the New Jersey Prevailing Wage Act (Chapter 150 of the Laws of 1963, as amended) (N.J.S.A. 34:11-56.25, et. seq.) and that award will not be made to any bidder whom the Commissioner of Labor and Industry does not certify. The Owner or the Engineer reserves the right to require a complete financial and experience statement from prospective bidders showing that they have satisfactorily completed work of the nature required before furnishing proposal forms or specifications, or before awarding the contract. Proposals for this contract will only be accepted from bidders who have properly qualified in accordance with the requirements of the Contract Documents. The right is also reserved to reject any or all bids or to waive any informalities where such informality is not detrimental to the best interest of the Owner, except as to those items which are deemed mandatory and non-waivable set forth in N.J.S.A. 40A:11-23.2. Further, the Owner reserves the right to abandon the project and reject the bids entirely if any legal or state or federal administrative action is taken against the Owner which could delay or jeopardize the project from commencing. The right is also reserved to increase or decrease the quantities specified in the manner designated in the Specifications. Any Bid Addenda will be on the Borough website and processed in accordance with N.J.S.A. 40A:11-23(c)(2). All interested bidders should check the website from now through bid opening. It is the sole responsibility of the respondent to be knowledgeable of all addenda related to this procurement. Bidders must have at the time of bid, a Business Registration Certificate issued by the New Jersey Department of Treasury. The successful bidder shall be required to comply with all applicable statutory and regulatory requirements, which include but are not limited to the affirmative action requirements of P.L. 1975, c. 127, N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27-1 et seq. The contract for this project is governed by the provisions of the Local Public Contracts Law, N.J.S.A. 40A: 11-1 et seq. Bidders must also comply with the requirements of P.L. 1977, Chapter 33 amending the Local Public Contracts Law. Bidders must submit a statement in accordance with N.J.S.A. 52:25-24.2 of all owners of the corporation setting forth the names and addresses of all the stockholders in the corporation or members of the partnership who own ten percent (10%) or more of its stock or have a ten percent (10%) or greater interest in the case of partnership. No bid may be withdrawn for sixty (60) days after the opening of bids. A Contract will be awarded to the lowest responsible bidder, or all proposals will be rejected within sixty (60) days after the opening of bids. The Borough of Florham Park reserves the right to delete sections of work from the contract after the award of the bid has been made due to funding or other reasons. Bidders are encouraged to visit the site to review the scope of construction work at the site. The Mayor and Borough Council of the Borough of Florham Park reserve the right to reject any or all bids, to reject unbalanced bids, to waive any informality therein in any bid, and to accept any bid that will be in the best interest of the Borough of Florham Park according to N.J.S.A. 40A:11-1.

Bid Results

Water / Sewer

$570,001.00

Public - City

Site Work

9

20

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Noise Barriers, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Aluminum Windows, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Fireplaces and Stoves
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Central Cooling Equipment, Decentralized HVAC Equipment, Radiant Heating Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
557
Active Projects
327
Bidding Soon
5,156
All Active Projects
2,428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 6, 2024

img_map_placeholder

To Be Determined, Florham Park, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bar Screen Improvements - Florham Park Sewer Utility

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.