BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and renovation of a mixed-use development in Carson, California. Completed plans call for the renovation of a water / sewer project; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

There are two steel support structures showing signs of severe corrosion and require rehabilitation. Each steel structure supports a conveyor belt which transports biosolid materials between Centrifuge Building 2 and the Biosolids Storage Building. The conveyors must remain in service at all times during the rehabilitation work. Where required, the rehabilitation consists of new stainless steel connection bolts, stainless steel gusset plates and structural steel members. The work also includes increasing the existing subgrade concrete foundation, application of a polyurethane coating on the steel members and replacing concrete curbs, slabs and asphalt pavement. The work of construction must be completed within 475 WORKING DAYS after the date in the Notice to Proceed. Est. Completion Date: May 19, 2026 Est. Value Notes: 2,250,000 - 3,250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. GENERAL DESCRIPTION OF WORK The work to be performed under the provisions of these Contract Documents consists of furnishing all materials, equipment and tools, the performance of all necessary labor, and the construction complete, including all work appurtenant thereto, for the construction of the AK Warren Water Resource Facility Conveyor Support Structures Rehabilitation Project located at 24501 S. Figueroa St., Carson, California, 90745. The work includes, but is not necessarily limited to, the following: excavation; shoring, backfill, disposal of excavation material and/or importation of fill and backfill material; grading; paving; modifications to existing concrete foundations; removal of biosolid material in work areas; demolition of existing embedded column anchor bolts and existing structural steel members; installation of new embedded column anchor bolts, new structural steel members and steel connection bolts; and all other appurtenant work as shown on Drawing No. JO-g-1342 and as specified in these Special Provisions (DOC 6729940) and the Standard Specifications. Board of Directors meeting date June 26, 2024

Bid Results

Water / Sewer

$2,485,700.00

Public - County

Paving, Renovation, Site Work

35

16

15

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
110
Bidding Soon
2,322
All Active Projects
1,029
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

July 8, 2024

img_map_placeholder

24501 S Figueroa St, Carson, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.