BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Selkirk, New York. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000347699 Job Location 98 Dinmore Rd Selkirk, New York United States 12158 Question Acceptance Deadline 04/15/2024 02:00 PM EDT The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion the work shown on the Drawings and described in these Specifications including, but not necessarily limited to, the following: Remove existing concrete floor topping from two clarifiers, repair concrete surfaces as determined necessary after topping removal, and install new concrete topping on clarifier floors. - The Work consists of replacement of grout within the exiting WWTP clarifiers. The successful Bidder will be required to furnish construction performance and payment bonds in the full amount of the contract price. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % *Owner reserves the right to reject any and all Bids, to waive any and all informalities and the right to disregard all nonconforming, non-responsive or Conditional Bids. The Work will be substantially completed on or before September 6, 2024 ; final completion- on or before September 27, 2024 WORK SEQUENCE A. The Work shall be conducted in 2 phases. 1. Phase 1: Clarifier #1. Clarifier #2 shall remain in service during the repair of Clarifier #1. Work for this phase shall be substantially complete and ready for occupancy within 45 calendar days of commencement of construction. 2. Phase 2: Clarifier #2. Clarifier #1 shall remain in service during the repair of Clarifier #2. Work for this phase shall be substantially complete and ready for occupancy within 90 calendar days of commencement of construction.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Renovation

6

10

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
80
Bidding Soon
1,613
All Active Projects
792
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 27, 2024

img_map_placeholder

98 Dinmore Rd, Selkirk, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.