Site work and paving for a mixed-use development in North Andover, Massachusetts. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

The City of Lawrence, through the Lawrence Airport Commission, invites sealed bid proposals for Runway 5 End Drainage Improvements, in accordance with the provisions of M.G.L. c. 30, 39M. Proposed improvements include 200 LF of stream restoration, 100 LF of bank erosion repair and 650 LF of storm drainage infrastructure. The work includes, but is not necessarily limited to: airfield work zone setups, erosion controls; sandbag diversion dam; earthwork; subbase; topsoil and seeding; stream stabilization; fence installation; electrical conduit and wiring; and incidentals. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 02/28/2025 at 12:00 PM ET All questions or requests for clarification regarding the bid documents or the project are to be submitted by email to airport.bids@stantec.com (subject line: "Lawrence Airport Drainage Project Questions"). The deadline for submission of questions The project is located on the airfield within the airport security fence at the south end of the airport adjacent to Runway 5. The intent of the project is to restore approximately 200 LF of intermittent stream, repair approximately 100 LF of bank erosion and install approximately 650 LF of storm drainage pipe and manholes. The new storm drainage infrastructure will be used to temporarily divert the intermittent stream for the restoration work and will permanently divert a portion of stormwater to a point further downstream. The work also includes but is not necessarily limited to: airfield safety measures including safety fence, cones, barricades, and runway closure markers; erosion controls; sand bag diversion dam; earthwork; subbase; topsoil and seeding; stream stabilization; fence removal and replacement; electrical conduit and wiring; and incidentals. The work will also require the contractor to provide qualified operators ("Escorts) with Airband radio equipped vehicles who will be trained by the airport to communicate with the Air Traffic Control Tower to escort construction vehicles and equipment to and from the work site throughout the duration of the project. The total contract time for completion is 50 calendar days. The estimated cost is approximately $700,000.00.

Bid Results

Transportation Terminals

$931,675.00

Public - City

Paving, Site Work

24

19

5

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
512
Active Projects
192
Bidding Soon
4,092
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2025

April 7, 2025

Project location map

492 Sutton St, North Andover, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.