BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Grinnell, Iowa. Completed plans call for site work for a road / highway; and water / sewer project.

The Project includes the following Work: 1. Construction of a new 1,200 GPM well in the Jordan Aquifer, Well No. 10. 2. All required development and testing of the well. 3. Site work including clearing and grubbing of trees as shown in the Drawings and grading of the finished site with positive drainage within 15 feet of the wellhead. 4. All other Work shown in the Drawings and called for in the Specifications. The Work shall be performed at 703 Broad St, Grinnell, Iowa 50112. Est. Completion Date: Nov. 30, 2024 All bids must be filed in the office of the City Clerk before the time herein set on forms furnished by the Owner, and must be enclosed in a separate sealed envelope and plainly identified. Each bid shall be accompanied by bid security as defined in Iowa Code Section 26.8, and in the amount of 5% of the total amount ofthe bid, as specified in the Bidding Documents, as security that ifawarded a contract, the bidder will enter into a contract at the prices bid and furnish the required performance and payment bonds and Certificate of Insurance The successful Bidder will be required to furnish Performance and Payment Bonds acceptable to the Owner on forms provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Work on the improvement shall commence within 30 days after the Effective Date of the Contract, or on the day indicated in the Notice to Proceed. The Notice to Proceed will be issued upon approval of the contract and bonds by the City Council. The workshall be substantially completed on or before November 30, 2024, and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before December 31,2024. Failure to meet eitherthe Substantial Completion date or Final Completion date will result in the assessment of liquidated damages in the amount of $1,000.00 per calendar day. The Owner hereby reserves the right to reject any or all bids, to waive informalities and irregularities, and to enter into such contract or contracts as it shall deem to be in the best interest of the City. The Project includes the following Work: 1. Construction of a new 1,200 GPM well in the Jordan Aquifer, Well No. 10. 2. All required development and testing of the well. 3. Site work including clearing and grubbing of trees as shown in the Drawings and grading of the finished site with positive drainage within 15 feet of the wellhead. 4. All other Work shown in the Drawings and called for in the Specifications. The Work shall be performed at 703 Broad St, Grinnell, Iowa 50112.

Award

Water / Sewer

$3,315,767.00

Public - City

Site Work

16

21

12

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
61
Bidding Soon
1,205
All Active Projects
422
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 30, 2024

June 10, 2024

December 30, 2024

img_map_placeholder

703 Broad St, Grinnell, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.