Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a water / sewer project in Monticello, New York. Working plans call for the renovation of a water / sewer project.
**As of May 04, 2026, the bids received were rejected.. No definite date for the rebid.** Bidders shall comply with CWSRF requirements, including Minority/Women Owned Business requirements 20% M/WBE combined goal. Grant funding from the Environmental Facilities Corporation (EFC) through the federal Infrastructure Investment and Jobs Act of 2021, also known as the Bipartisan Infrastructure Law (BIL) Work includes general upgrades to the WWTP, including improvements to the influent channel/flow splitter box, oxidation ditches, tertiary sand filters, sludge holding tank, RAS/WAS pumps, sludge dewatering system and drying beds, an existing pump station, and various existing buildings. Work also includes construction of a new pump station, new UV disinfection building, new aerobic sludge digester and building, new WWTP workshop/maintenance building, yard piping, site work, and other related miscellaneous work. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within forty-five (45) days after the actual date of opening thereof. The Owner reserves the right to waive any informalities or irregularities in the Bids received, or to reject any or all Bids without explanation, and to select the Bid, the acceptance of which, in its judgment, will best assure the efficient performance of the work. Bidders are advised that Labor and Material and Performance Bonds, each in the amount of 100% of the contract prices, as well as a Certificate of Insurance demonstrating required coverage, shall be provided by the successful bidder(s). In addition, the successful bidder(s) shall provide a one-year maintenance bond in the amount of 100% of the contract price at the completion of work.
Final Planning
Water / Sewer
$27,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
November 4, 2026
128 Rock Ridge Dr, Monticello, NY
Related To This Project
Monticello, NY
Bid Date: Oct 29 2025
Monticello, NY
--
Monticello, NY
Bid Date: Jul 23 2024
Monticello, NY
--
Monticello, NY
Bid Date: Mar 29 2024
Monticello, NY
Bid Date: Apr 05 2024
Monticello, NY
Bid Date: Mar 15 2024
Monticello, NY
--
Monticello, NY
Bid Date: Feb 23 2024
Monticello, NY
Bid Date: Feb 23 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
