Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Holbrook, Arizona. Completed plans call for the renovation of a educational facility.
Summary Holbrook Unified School District, #3 is in Navajo County serving our K-12 Community. This Project will be funded with Federal money. This is a project is for Renovations at Holbrook High School to Create Science Classrooms. The district hopes to occupy this space in August of 2024. Question Submission Deadline:April 16, 2024, 12:00pm Background Bring your subcontractors with you to this prebid. This will be the only opportunity to visit the site on an occupied campus. Construction Scope of Work 8.1. General Information Holbrook Unified School District, #3 in Navajo County. This Project will be funded by the Division of School Facilities. 8.2. Specifications Specifications are designed to enable bidder to convey the requirements for a product, material, process, or service. A specification may be expressed as a standard, part of a standard, or independent of a standard. No specification is intended to limit competition by eliminating items capable of satisfactorily meeting the requirements of this procurement. If bidder believes a specification is unnecessarily restrictive, bidder must indicate in the deviations and exceptions section of your response. 8.3. Required General Contractor License Bidder certifies that Bidder is aware that the Contract cannot be awarded to Bidder unless, at the time of the submitting a bid, he/she is the holder of a valid Arizona Contractor's License proper and adequate for the work required by the Contract, and that the failure to obtain proper and adequate licensing for an award of the Contract shall result in the forfeiture of the Bidder's Security. If you subcontract any work, you must also have that type of license, or have a KB-1 or KB-2. 8.4. Required Subcontractor License Bidder certifies that Bidder is aware that the Contract cannot be awarded to Bidder unless, at the time of the submitting a bid, all subcontractors' hold of a valid Arizona Contractor's License proper and adequate for the work required by the Contract. 8.5. Labor and Materials Unless otherwise indicated, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, facilities and services necessary for the proper execution and completion of the Work. The Contractor shall enforce strict discipline and good order among his employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit person(s) not skilled in the task assigned to them. 8.6. Protection of Work and Rain Protection of Existing Structures Contractor shall provide all protection required to ensure that all completed work and all existing construction will not be subject to weather damage. The Contractor may at his option and expense install any lawful security measures he deems necessary to protect his materials, equipment or finished work. Type of security devices or quantity shall be the sole responsibility of the Contractor. The Contractor is to provide security and protect the project until HUSD has occupied the space or Holbrook Unified School District, #3 has accepted the space. Protection: The Contractor shall be responsible for the protection of all materials and work. The Contractor shall include in his proposal the cost of any temporary sheathing, plastic covering, etc., as may be required to protect affected areas. Remove all such temporary work at the proper time during the construction period and repair all damage related to same. The Contractor is responsible for the protection of the area in which work is being performed. Contractor shall manage a sequence of work in regard to demolition and removal of existing roofing and installation of new decking and roofing so that existing interior spaces are protected from weather damage, including wind, sun and rain. 8.7. Drawings The plans prepared for this project present a description of the work to be accomplished. The contractor shall visit the project site and determine, from his own inspection, the conditions under which it is to be performed. The contractor, by making his bid, represents that he has visited the site and familiarized himself with local conditions, the type of work to be performed, evaluated the difficulty of performing the required tasks, and the labor, equipment and material that are required to provide a complete project. Quantities listed on these plans are estimates only. The contractor shall verify all quantities before submitting a bid for this work. A thorough attempt has been made to show the locations of all underground obstructions and utility lines in the work area; however, the contractor shall be responsible for any damage to obstructions and utility lines encountered during construction and shall determine the exact location of said utilities in advance of trenching. The engineer will not guarantee any elevations or locations of existing under-ground utilities shown on these plans. The contractor shall call blue stake prior to construction and verify the presence of utilities and shall protect any overhead or underground utilities during construction, whether or not said utilities are shown on these plans. The contractor shall make exploratory excavations to locate underground utilities and/or structures if necessary to verify underground utilities. Where existing underground utilities are exposed, contractor shall notify the appropriate utility company for inspection prior to backfilling. Private Utilities staking must be done if digging more than 12" deep to avoid the possibility of hitting such items as fiber lines. 8.8. Asbestos and Lead Testing The report provided by is attached and incorporated within the attachments for reference. #Attachments 8.9. Temporary Facilities Sanitary Facilities: Provide temporary toilets, wash facilities, safety shower and eyewash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities have jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities. Protection of Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Holbrook High School and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities. Site Enclosure Fencing: Before construction operations begin, furnish and install site enclosure fence in a manner that will prevent people from easily entering the site except by entrance gates. Maintain security by limiting the number of keys and restricting distribution to authorized personnel. Security Enclosure and Lockup: install temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security. Lock entrances at the end of each workday. Barricades, warning signs, and lights: Comply with requirements of authorities have jurisdiction for erecting structurally adequate barricades, including warning signs, and lighting. 8.10. Site Staging, Storage, Security, and Parking The owner will make accommodations and discuss at the prebid. 8.11. Special Site Conditions The contractor shall be completely responsible for protecting the existing building from damage and/or injury due to this work and shall repair at the contractor's expense and to the EMC2 Architects satisfaction, all areas damaged as a result of their work. 8.12. Preconstruction Meeting Immediately after execution of the Purchase Order and not less than five (5) days prior to commencement of work, a meeting will be held between HUSD, the Contractor, the major Subcontractors, to outline in general the procedures to be followed during the construction phase of the Project.
Bid Results
Educational
$2,447,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2024
May 28, 2024
455 N 8th Ave, Holbrook, AZ
Related To This Project
Holbrook, AZ
Bid Date: Jun 05 2024
Holbrook, AZ
Bid Date: May 09 2024
Holbrook, AZ
Bid Date: Jun 26 2024
Holbrook, AZ
Bid Date: Jul 12 2024
Holbrook, AZ
Bid Date: Jan 10 2025
Holbrook, AZ
Bid Date: Oct 25 2024
Holbrook, AZ
Bid Date: Oct 07 2024
Holbrook, AZ
Bid Date: Oct 07 2024
Holbrook, AZ
Bid Date: Apr 18 2024
Holbrook, AZ
Bid Date: Apr 18 2024
Holbrook, AZ
Bid Date: Apr 25 2024
Holbrook, AZ
Bid Date: Apr 11 2024
Holbrook, AZ
Bid Date: Mar 28 2024
Holbrook, AZ
Bid Date: Apr 04 2024
Holbrook, AZ
Bid Date: Mar 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.