EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Holbrook, Arizona. Completed plans call for the renovation of a educational facility.

Summary Holbrook Unified School District, #3 is in Navajo County serving our K-12 Community. This Project will be funded with Federal money. This is a project is for Renovations at Holbrook High School to Create Science Classrooms. The district hopes to occupy this space in August of 2024. Question Submission Deadline:April 16, 2024, 12:00pm Background Bring your subcontractors with you to this prebid. This will be the only opportunity to visit the site on an occupied campus. Construction Scope of Work 8.1. General Information Holbrook Unified School District, #3 in Navajo County. This Project will be funded by the Division of School Facilities. 8.2. Specifications Specifications are designed to enable bidder to convey the requirements for a product, material, process, or service. A specification may be expressed as a standard, part of a standard, or independent of a standard. No specification is intended to limit competition by eliminating items capable of satisfactorily meeting the requirements of this procurement. If bidder believes a specification is unnecessarily restrictive, bidder must indicate in the deviations and exceptions section of your response. 8.3. Required General Contractor License Bidder certifies that Bidder is aware that the Contract cannot be awarded to Bidder unless, at the time of the submitting a bid, he/she is the holder of a valid Arizona Contractor's License proper and adequate for the work required by the Contract, and that the failure to obtain proper and adequate licensing for an award of the Contract shall result in the forfeiture of the Bidder's Security. If you subcontract any work, you must also have that type of license, or have a KB-1 or KB-2. 8.4. Required Subcontractor License Bidder certifies that Bidder is aware that the Contract cannot be awarded to Bidder unless, at the time of the submitting a bid, all subcontractors' hold of a valid Arizona Contractor's License proper and adequate for the work required by the Contract. 8.5. Labor and Materials Unless otherwise indicated, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, facilities and services necessary for the proper execution and completion of the Work. The Contractor shall enforce strict discipline and good order among his employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit person(s) not skilled in the task assigned to them. 8.6. Protection of Work and Rain Protection of Existing Structures Contractor shall provide all protection required to ensure that all completed work and all existing construction will not be subject to weather damage. The Contractor may at his option and expense install any lawful security measures he deems necessary to protect his materials, equipment or finished work. Type of security devices or quantity shall be the sole responsibility of the Contractor. The Contractor is to provide security and protect the project until HUSD has occupied the space or Holbrook Unified School District, #3 has accepted the space. Protection: The Contractor shall be responsible for the protection of all materials and work. The Contractor shall include in his proposal the cost of any temporary sheathing, plastic covering, etc., as may be required to protect affected areas. Remove all such temporary work at the proper time during the construction period and repair all damage related to same. The Contractor is responsible for the protection of the area in which work is being performed. Contractor shall manage a sequence of work in regard to demolition and removal of existing roofing and installation of new decking and roofing so that existing interior spaces are protected from weather damage, including wind, sun and rain. 8.7. Drawings The plans prepared for this project present a description of the work to be accomplished. The contractor shall visit the project site and determine, from his own inspection, the conditions under which it is to be performed. The contractor, by making his bid, represents that he has visited the site and familiarized himself with local conditions, the type of work to be performed, evaluated the difficulty of performing the required tasks, and the labor, equipment and material that are required to provide a complete project. Quantities listed on these plans are estimates only. The contractor shall verify all quantities before submitting a bid for this work. A thorough attempt has been made to show the locations of all underground obstructions and utility lines in the work area; however, the contractor shall be responsible for any damage to obstructions and utility lines encountered during construction and shall determine the exact location of said utilities in advance of trenching. The engineer will not guarantee any elevations or locations of existing under-ground utilities shown on these plans. The contractor shall call blue stake prior to construction and verify the presence of utilities and shall protect any overhead or underground utilities during construction, whether or not said utilities are shown on these plans. The contractor shall make exploratory excavations to locate underground utilities and/or structures if necessary to verify underground utilities. Where existing underground utilities are exposed, contractor shall notify the appropriate utility company for inspection prior to backfilling. Private Utilities staking must be done if digging more than 12" deep to avoid the possibility of hitting such items as fiber lines. 8.8. Asbestos and Lead Testing The report provided by is attached and incorporated within the attachments for reference. #Attachments 8.9. Temporary Facilities Sanitary Facilities: Provide temporary toilets, wash facilities, safety shower and eyewash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities have jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities. Protection of Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Holbrook High School and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities. Site Enclosure Fencing: Before construction operations begin, furnish and install site enclosure fence in a manner that will prevent people from easily entering the site except by entrance gates. Maintain security by limiting the number of keys and restricting distribution to authorized personnel. Security Enclosure and Lockup: install temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security. Lock entrances at the end of each workday. Barricades, warning signs, and lights: Comply with requirements of authorities have jurisdiction for erecting structurally adequate barricades, including warning signs, and lighting. 8.10. Site Staging, Storage, Security, and Parking The owner will make accommodations and discuss at the prebid. 8.11. Special Site Conditions The contractor shall be completely responsible for protecting the existing building from damage and/or injury due to this work and shall repair at the contractor's expense and to the EMC2 Architects satisfaction, all areas damaged as a result of their work. 8.12. Preconstruction Meeting Immediately after execution of the Purchase Order and not less than five (5) days prior to commencement of work, a meeting will be held between HUSD, the Contractor, the major Subcontractors, to outline in general the procedures to be followed during the construction phase of the Project.

Bid Results

Educational

$2,447,000.00

Public - City

Renovation

52

32

25

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Thermal Protection, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Ceramic Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Wall Finishes, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Automatic Transfer Switches, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
1
Bidding Soon
43
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

May 28, 2024

img_map_placeholder

455 N 8th Ave, Holbrook, AZ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Renovations at Holbrook High School to Create Science Classrooms

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.