BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Oklahoma City, Oklahoma. Completed plans call civil work for a runway / taxiway.

Construction of Hangar 4 Will Rogers World Airport for the Oklahoma City Airport Trust Oklahoma City, Oklahoma. Construction of a new Hangar and new Fuel Workshop J.E. Dunn Will Be Receiving Bids for the Following Trade Packages: 01a - Final Clean 02c - Demolition 03a - Building Concrete 04a - Masonry 05a - Structural Steel Fabrication 05b - Structural Steel Erection 06a - Millwork and Finish Carpentry 06b - General Trades 07a - Membrane Roofing 07b - Joint Sealants, Expansion Joint Covers, and Firestopping 08a - Doors, Frames, and Hardware (Supply) 08e - Coiling Counter Doors, Overhead Doors, and Dock Equipment 08f - Hangar Doors 08g - Entrances, Storefronts, and Glazing 09a - Metal Stud Framing, Drywall, and Ceilings 09b - Painting and Coatings 09c - Flooring and Tile 09d - Sealed Concrete 10a - Toilet Accessories and Fire Specialties 10b - Signage 10c - Canopy 10d - Wall and Door Protection (Supply) 12c - Window Treatments 13b - Pre-engineered Metal Building Systems 21a - Fire Suppression 22a - Plumbing and Mechanical Combination 26a - Electrical 31a - Earthwork 32a - Site Paving 32g - Landscaping and Irrigation 32h - Fences and Gates 33a - Site Utilities Requests for Information, Clarifications, Corrections, or Changes of the Bidding Documents Must Be Made in Writing No Later Than 5:00:00 P.m. Wednesday April 17th, 2024. No Addenda Will Be Issued Later Than 3 Business Days Prior to Bid Opening. Submit All Questions in Writing to Nick Witte at Nick.witte@jedunn.com imited to, the following: 1. Insert a brief description of Project indicating the size, code classification for occupancy and construction type, and general description of major building assemblies and 2. Construct new approximately 1,067 square foot new Fuel Workshop and associated utilities, pavements, and temporary facilities required. This work is shown in a separate drawing package from the Hangar 4 drawing package. 3. Construct new approximately 82,250 square foot new Hangar 4 adjacent to the existing Hangar 3B complex and associated utilities, pavements, and temporary facilities. Partial demolition of Hangar 3B is included in this work, This work is shown in a separate drawing package from the Fuel Farm drawing package. 4. Other Work indicated in the Contract Documents. G. PROJECT DESCRIPTION: Construction of a new Hangar and new Fuel Workshop.

Post-Bid

Transportation Terminals

$35,000,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
48
Bidding Soon
440
All Active Projects
198
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

July 24, 2024

img_map_placeholder

Multiple Locations, Oklahoma City, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.