BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Fort Vermilion, Alberta. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

The Contractor shall undertake all work between the dates of July 1, 2024 and August 31, 2024 inclusive. Question Deadline 04/18/2024 Any inquiries respecting this RFP should be directed, in writing, to: Andy Banman, abanman@mackenziecounty.com Traffic Control for all linear markings on public streets and highways shall consist of an escort vehicle with a rotating amber beacon stationed to the rear of the line painting equipment. The stationing distance shall be commensurate with the speed limit in force on the respective street or highway. Where necessary, the Contractor shall supply flag persons or barricades to protect Workers and the Work. Paint Products may be either water based or organic solvent based Traffic Paint. Paint Products to be used shall conform to the Regular White Paint and Regular Yellow Paint formulations on the Alberta Transportation Products List. Prior to the start-up and at any time during the Work, the Contractor shall provide samples of all paint materials to be used. The County may arrange for testing of the paint samples. Glass Beads shall conform to AASHTO M247 Type 1 or Type 2. The County will undertake sweeping of all Hamlet roadways on the day prior to anticipated line painting operations. In addition to this, it will be the Contactor's responsibility to ensure that all surfaces to be painted are free of debris, dust, particulates and oils and are perfectly clean and dry. The paint and beads shall be applied at the following rates: Paint: 15-17 mils wet (38 to 42 litres/KM of 10cm line) Glass Beads: 0.6 to 0.7 kg per litre of paint Paint lines shall be applied to precisely cover existing markings. Where this cannot be achieved, old markings shall be obliterated. All road marking equipment shall be equipped with laser or video guidance systems to enable the paint to be applied with clean, sharp edges and in accordance with application rates and thickness specified. The temperature of the paint on application shall be between 40C and 70C unless otherwise indicated in the Manufacturer's specifications. All markings shall have sharp, defined edges, and shall be free of wobbles and irregularities. Spraying shall be done to avoid bleeding and overspray. Paint markings shall be protected by cones that remain in place until the paint is sufficiently dry to prevent spreading and tracking.

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
4
All Active Projects
2
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Fort Vermilion, AB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.