BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Fort Vermilion, Alberta. Completed plans call for site work for a road / highway.

The Contractor shall undertake all work between the dates of May 1, 2024 and June 30, 2024 inclusive. Traffic Control for all linear markings on public streets and highways shall consist of an escort vehicle with a rotating amber beacon stationed to the rear of the crack filling equipment. The stationing distance shall be commensurate with the speed limit in force on the respective street or highway. Where necessary, the Contractor shall supply flag persons or barricades to protect Workers and the Work. Where traffic must be diverted temporarily to allow for asphalt filler cooling and set up, a traffic management plan shall be provided. The liquid Asphalt to be applied must included in the Alberta Transportation Products List for Crack Sealing. Liquid Asphalt shall be designed for the temperature ranges encountered in Northwestern Alberta. The Proposal Submission shall include the product name as well as the supplier and manufacturer. Blotting Material may be sand, lime, limestone chips, potash, or cement powder. Surface Preparation shall include the drying, cleaning and removal of all vegetation, dirt, and debris from cracks. A hot air lance shall be used to ensure that the existing pavement temperature is a minimum of 40°C when applying the sealant. Unless the Manufacturer’s Specifications indicate otherwise, liquid asphalt shall be applied at a temperature at 190 – 210°C. The correct wand tip for the crack size shall be used to enable filling the crack from the bottom up. Sealant placed into and over the crack shall be shaped using a squeegee to create a band less than 3mm thickness and maximum 100mm wide over the crack and existing pavement. Blotting agents may not be applied until the liquid asphalt has sufficiently cooled to avoid inclusion of the blotting agent into the sealant. Cracks having a width exceeding 35mm shall not be included in crack filling.

Post-Bid

Roads / Highways

$100,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
15
All Active Projects
7
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 23, 2024

May 1, 2024

June 30, 2024

img_map_placeholder

Multiple Locations, Fort Vermilion, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.