BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2025 at 7:00 PM

Updated February 11, 2025

Renovation of a golf course in Newton, Massachusetts. Completed plans call for the renovation of a golf course.

Work under this contract shall consist of providing all the labor, material, equipment, transportation and supervision necessary to provide renovations to the Newton Commonwealth Golf Course Maintenance Facility to include new electrical, new mechanical, new office areas, new storage areas, new employee areas. Specific project requirements are set forth in the Technical Specifications and Plans attached hereto. This Invitation For Bid seeks a contract award for only one (1) contractor. The estimated value of this project is $1,500,000. This section specifies the construction phasing and scheduling of the work. 1. The building project must be substantially completed by April 30, 2025 2. The execution of work shall be tied into the specific areas on the CPM schedule. The sequence of work shall be in coordination with the Owner's preparation of the opening of the golf season. Final cleaning of the interior spaces shall be identified and coordinated with the Owner in preparation of phased occupancy. 3. Critical Path Method (CPM) scheduling of the Work. A. Definitions: 1. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling theconstruction project. Activities included in a construction schedule consume time and resources. 1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times. 2. Predecessor activity is an activity that must be completed before a given activity can be started. 2. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project. 3. Critical Path: The longest continuous chain of activities through the network schedule that establishes the minimum overall Project duration and contains no float. 4. Event: The starting or ending point of an activity. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. DCAMM Certification and 5% Bid Surety Required.

Award

Golf Course

$753,176.00

Public - City

Renovation

46

8

24

2

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
577
Active Projects
270
Bidding Soon
3,952
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 1, 2025

Project location map

212 Kenrick St, Newton, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.