BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2024 at 8:00 PM

Updated May 3, 2024

Renovation of a mixed-use development in Oakland, California. Completed plans call for the renovation of a educational facility.

The project consists of replacement of the existing medium voltage, "Substation C", at Merritt College. The existing Substation C system is to remain active until the replacement is installed and power has been transferred, includes demolition of the existing equipment, associated civil, landscape, structural and electrical work. Question Deadline 04/11/2024 at 3:00 PM PT For any questions and concerns, contact the Project Manager, Verna Van at vvan@kitchell.com and the Buyer, Seraphine Nzomo at snzomo@peralta.edu

Post-Bid

Power Plant

$150,000.00

Public - City

Renovation

48

14

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
202
Bidding Soon
3,103
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 29, 2024

Project location map

12500 Campus Dr, Oakland, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.