BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Effingham, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

The proposed work is officially known as "2024 Sidewalk Replacement Program Phase I" for the City of Effingham, Effingham, Illinois. The project shall consist of the removal and replacement of the sidewalks, removal and replacement of curb and gutter, and removal and replacement of driveway pavement shown herein and other miscellaneous work. Each proposal shall contain the name of every person or firm interested in the same and shall be accompanied by a bid bond, bank cashier's check, bank draft or certified check for not less than five (5) percent of the amount of the bid. A surety bond for the full amount of the award is required. Failure on the part of the contractor to deliver the materials within the time specified or to do the work as specified herein will be considered just cause to forfeit the surety as provided in Article 108.10 of the State of Illinois Standard Specifications for Road and Bridge Construction, adopted January 1, 2022. The City of Effingham reserves the right to reject any or all bids, waive or not waive any informality in the bids, and to accept any bid which it deems most favorable to the City. Proposals must be submitted to the City Clerk Office, City of Effingham on a form furnished by the Municipality, which may be obtained at the office of the City Engineer, City of Effingham and shall be enclosed in a separate and sealed envelope endorsed "2024 Sidewalk Replacement Program Phase I". It is agreed that this bid may not be withdrawn for a period of 45 days from opening thereof or it will be subject to forfeit the 5% Bid Bond provided with the bid. It is anticipated that a Notice of Award of a contract will be issued within 30-to-45 days of the date bids are received and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award if contractor provides proper insurance and bonding in a timely manner. Contractor shall not pay less than the prevailing wage to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820ILCS 130/1-12). Work on this project is subject to the Illinois Substance Abuse Prevention on Public Works Project Act as enacted by P.A. 95-0635.

Award

Sidewalks / Parking Lot

$167,659.00

Public - City

Paving, Site Work

8

5

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
28
Bidding Soon
413
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 16, 2024

img_map_placeholder

Multiple Locations, Effingham, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.