BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Auburn, Washington. Completed plans call for site work for a water / sewer project.

The Soos Creek Fish Hatchery raises, and releases fall Chinook salmon, Coho salmon, and both winter- and summer-run steelhead. The hatchery has been largely rebuilt through a series of recent projects. This project is intended to improve the management of process water and expand reuse capacity of the hatchery. The project involves work on an active fish hatchery, which must be completed with extreme caution to avoid harm to fish. Maintaining adequate water supply and water quality during the project are essential to hatchery operations. Project tasks must be completed during prescribed work periods listed below. This project includes the following items of work Bid Item 1: Mobilization, TESC, surface finishing, demobilization: Provide all labor, material, equipment, and miscellaneous items necessary and incidental to perform the following work, all as shown and described in the Contract Drawings. A. Mobilize to the site. B. Establish and maintain Temporary Erosion and Sediment Controls. C. Restore surfaces (grass, crushed rock, asphalt, and curb) to pre-project conditions. D. Demobilize from the site. Bid Item 2: Distribution Box 2 Expansion: Provide all labor, material, equipment, and miscellaneous items necessary and incidental to perform the following work, all as shown and described in the Drawings and Specifications. A. Relocate existing ladder and modify existing railing to accommodate access. B. Reroute any obstructing electrical conduits or other utilities as needed to avoid conflict. C. Expand Distribution Box 2 with a new concrete chamber including pipe, fittings, valves, and necessary supports. D. Install 4-inch drain line and valve. E. Cut 24-inch by 24-inch opening in concrete wall of existing distribution box 2. F. Install Owner-provided aerators, provide and install required supports. G. Install 24-inch raceway reuse supply between Distribution Box 2 and elbow installed in Bid Item 1, including pipe, fittings, and supports, and flow meter. H. Install Stairway Provide all labor, materials, equipment, and permits to construct D-Box 2 expansion and expand reuse system at the Department's Soos Creek Hatchery, located at 13030 SE Auburn-Black Diamond Road, Auburn, Washington 98092 in King County

Award

Water / Sewer

$1,755,000.00

Public - State/Provincial

Site Work

3

24

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
27
Bidding Soon
668
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

June 17, 2024

img_map_placeholder

13030 SE Auburn-Black Diamond Rd, Auburn, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.