BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Eastport, Michigan. Completed plans call for site work for a playground / park / athletic field.

General scope of work: Removal of existing pedestals and installation of new pedestals at Barnes Park Campground, 12298 Barnes Park Road, Eastport, MI. Permitting: All necessary permits are the responsibility of the Contractor The time for completion may be extended if reasonable explanation can be provided to the County. The time of extension is completely at the discretion of the County. Licensing - Permitting: The Contractor must be licensed and is responsible for obtaining the permits necessary to complete the work. The bid must include the cost of obtaining such permits and all labor necessary to complete the job. Bid Specifications The Specifications are for informational purposes only. The accuracy of the Specifications is not guaranteed. 1. Contractor is responsible for the following: a. Contractor shall verify service is adequate for this project. If not, include the upgrade of the service in the bid total. b. Removal and disposal of existing pedestals and any other wiring or materialsof campsites receiving new pedestals. c. Installation of 19 new electric pedestals at campsites 51, 55, 56, 57, 58, 60, 61, 62, 63, 64, 65, 67, 68, 69, 70, 70B, 71, 73, 74. New pedestals must be 50-Amp 240-Volt, 30- Amp 120-Volt and 120-Volt GFCI Outlet. All new pedestals shall be located in the same location as previous pedestals. d. Site 54 pedestal needs to be re-located, but not replaced. Confirm location with Parks Director. 2. The above work shall include trenching and backfilling. 3. Pedestals shall be protected against rodents with an application of mouse-proof foam, an infill of pea stones, and an additional application of mouse-proof foam. Other methods of rodent protection are allowed if approved by the Parks Director. 4. Special care shall be taken throughout the project to prevent any unnecessary tree damage. 5. The Contractor shall be responsible for marking of existing wires. 6. The Contractor shall be responsible for contacting Miss Dig and have utilities marked before any work commences. 7. The Contractor shall make any necessary arrangements with Great Lakes Energy, the electric company. 8. The Contractor must work closely with the Parks Director regarding the placement of the new pedestals. 9. All construction debris must be removed by the Contractor before the project is considered complete. The Contractor must observe all laws and ordinances governing the disposal of debris. 10. During the project, the Contractor shall take care to adequately barricade any portion of the project that is unsafe to the public. 11. The Contractor shall be responsible for the following: Power company fees, site restoration, cutting or replacement of concrete or pavement, and repairs to any unmarked utilities. 12. Before any cutting or replacement of concrete or pavement commences, the Parks Director must be consulted. 13. Subcontracting for portions of the project is allowed. Questions regarding the bid specifications shall be directed to Anna Hall at 231-599-2712 or halla@antrimcountymi.gov. Acceptance and Rejection of Bids: The Contractor chosen by Antrim County shall not discriminate against any worker, employee, or applicant for employment because of race, color, religion, height, weight, marital status, national origin, ancestry, sex, age, (except where requirements as to age is based upon a bona fide occupational qualification), or disability (that is unrelated to the individual's ability to perform duties of a particular job or position) pursuant to 1976 PA 453, as amended, MCL 37.2101 et seq. (Elliot-Larsen Civil Rights Act).The County of Antrim reserves the right to accept and/or reject any and all bids, to waive any irregularity in a bid, and to accept that bid which, in the opinion of the Board of Commissioners, is in the best interest of the County. It is the intention of the Board to award all work to a single bidder. This project must be completed in the fall to reduce the risk of spreading oak wilt. After a contract has been negotiated and signed, materials can be ordered. As the campground is open to camping until October 28, no work shall take place onsite until October 29, 2024. Each bid must be accompanied by a bid bond duly executed by a surety company approved by the owner and payable to the owner for 5% of the total amount of the bid. A certified check, drawn in the owner's name, may be used in lieu of a bid bond.

Award

Playgrounds / Parks / Athletic Fields

$77,329.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
31
Bidding Soon
345
All Active Projects
111
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 21, 2024

June 20, 2024

December 31, 2024

img_map_placeholder

12298 Barnes Park Rd, Eastport, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.