BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Maryville, Missouri. Completed plans call for the renovation of a educational facility; for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The project includes finishing the interior of Room 113 with new wall finishes, flooring, and ceiling; installing milk processing equipment and tanks including custom stainless steel fabrication; construction of new mechanical equipment room and exterior awning; new chiller, boiler, and pumps for processing equipment; new concrete pavement on site; new lighting for interior space and exterior; and new rooftop unit and ductwork to condition Room 113. MBE/WBE/SDVE Goals: MBE 10%, WBE 10% & SDVE 3% Note: Only MBE/WBE firms certified by a State of Missouri public entity, and SDVE(s) meeting the requirements of Section 34.074, RSMo, and 1 CSR 30-5.010, as of the date of bid opening, can be used to satisfy the MBE/WBE/SDVE participation goals for this Project. Question Deadline 04/25/2024 at 5:00 PM CT Every request for interpretation shall be made in writing and submitted with all supporting documents. The Work consists of finishing the interior of Room 113 with new wall finishes, flooring, and ceiling; installing milk processing equipment and tanks; construction of a new mechanical equipment room; new HVAC equipment; new lighting for interior space and exterior; new exterior paving; and construction of an exterior covering over the milk receiving area. 1. The Work includes the supply and installation of milk processing equipment such as storage tanks, a milk separator, pasteurizer, homogenizer, cooling press, bottle filler, a walk-in cooler, and custom stainless steel fabrications. Systems to support the processing equipment would need to be provided and include a new ice builder, boiler, and pumps.Additional HVAC work includes a new rooftop unit and ductwork to condition and exhaust Room 113.

Post-Bid

Educational

$150,000.00

Public - State/Provincial

Paving, Renovation, Site Work

63

29

28

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
48
Bidding Soon
871
All Active Projects
327
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 2, 2024

May 29, 2024

February 3, 2025

img_map_placeholder

22893 U. S. Hwy 71, Maryville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.