Site work, asbestos abatement and renovation of a mixed-use development in Montebello, California. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

Monitoring consultant for District office window removal, FRE door removal and PHE door removal for asbestos and lead based paint. Abatement will be monitored by your CAC or CSST Environmental consultant. 1. You will monitor all work with a CSST and CAC consultant. 2. Make sure all work is to be State notified AQMD and OSHA or other. 3. Make sure all employees have current abatement credentials. 4. Make sure all labor and materials are in proper use. 5. Make sure of Proper PPE equipment to be in place during abatement. 6. Each site will be abated at different days depending on site schedule. 7. Work will take place in the afternoon hours, Saturdays and Sundays. 8. Make sure we have Containment needed to include a three stage decon. 9. Make sure of proper RCRA disposal with manifest. 10. Project is not complete until T.E.M air result has been achieved by your staff rush samples. The District is requesting bids on the three sites for small scale abatement. District office windows, PHE door removal, and FRE door removal that contain asbestos and lead based paint. Bids should include all necessary labor and equipment and other incidental and appurtenant work necessary to satisfactorily complete the work as further described in the Scope of Work. Questions must be submitted to Noe Reyes, reyes_noe@montebello.k12.ca.us and are due April 15, 2024, at 9:00 a.m. This project is subject to the enforcement of the DLSE PWR Monitoring/Enforcement by the Department of Industrial Relations (DIR), Division of Labor Standards Enforcement Pursuant to Labor Code 1771. Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code and be licensed to perform the work called for in the contract documents. The successful bidder must possess a valid and active abatement license for asbestos and lead removal valid through project completion. Proposal cost to include prevailing wages, payment & performance bonds if quote exceeds $25,000.00, and the mandatory insurance requirements per the attachment. Monitoring consultant for District office window removal, FRE door removal and PHE door removal for asbestos and lead based paint. Abatement will be monitored by your CAC or CSST Environmental consultant. 1. You will monitor all work with a CSST and CAC consultant. 2. Make sure all work is to be State notified AQMD and OSHA or other. 3. Make sure all employees have current abatement credentials. 4. Make sure all labor and materials are in proper use. 5. Make sure of Proper PPE equipment to be in place during abatement. 6. Each site will be abated at different days depending on site schedule. 7. Work will take place in the afternoon hours, Saturdays and Sundays. 8. Make sure we have Containment needed to include a three stage decon. 9. Make sure of proper RCRA disposal with manifest. 10. Project is not complete until T.E.M air result has been achieved by your staff rush samples. 11. You are responsible for monitoring for tear down after clearance. 12. You are responsible for all testing, sampling for clearances to include reports at the conclusion of work. If proposals are submitted in any other type, the District reserves the right to reject the proposal as nonresponsive. SCOPE OF WORK Monitoring consultant for District office window removal, FRE door removal and PHE door removal for asbestos and lead based paint. Abatement will be monitored by your CAC or CSST Environmental consultant. 1. You will monitor all work with a CSST and CAC consultant. 2. Make sure all work is to be State notified AQMD and OSHA or other. 3. Make sure all employees have current abatement credentials. 4. Make sure all labor and materials are in proper use. 5. Make sure of Proper PPE equipment to be in place during abatement. 6. Each site will be abated at different days depending on site schedule. 7. Work will take place in the afternoon hours, Saturdays and Sundays. 8. Make sure we have Containment needed to include a three stage decon. 9. Make sure of proper RCRA disposal with manifest. 10. Project is not complete until T.E.M air result has been achieved by your staff rush You are responsible for monitoring for tear down after clearance. 12. You are responsible for all testing, sampling for clearances to include reports at the conclusion of work Bid Results : TITAN ENVIRONMENTAL District Office $10,440.00 PHE $ 3,235.00 FRE $ 3,235.00

Bid Results

Educational

$16,910.00

Public - City

Asbestos Abatement, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
95
Bidding Soon
2,233
All Active Projects
990
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2024

May 20, 2024

img_map_placeholder

Multiple Locations, Montebello, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.