BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Rome, Georgia. Completed plans call for the renovation of a residential development.

The work will be awarded in one contract and shall conform in all respects to the Specifications contained in this bid package. The Bid Package is available for review in the office of the Purchasing Director of the Board of Commissioners of Floyd County, which is also the office of the undersigned. Said specifications and general conditions are open to the inspection of the public. All forms, certifications and compliance documents required by Floyd County must accompany each bid. Including, but not necessarily limited to, compliance with the Georgia Security and Immigration Compliance Act OCGA 13-10-90 et. seq. Contractor must complete and submit with bid, the Contractor Affidavit under OCGA 13-10-91(b)(1) included with contract documents. All questions regarding this bid must be sent via email to Bill Gilliland at bill.gilliland@floydcountyga.org and Randy E. Self at randy.self@floydcountyga.org. Question Deadline 04/26/2024 at 12:00 PM ET : A Bid bond of 5% of the bid amount is required to be submitted with this bid. Performance and Payment Bonds are required in the amount of 100% of the Bid Amount. The right is reserved to the Board of Commissioners of Floyd County, Georgia to delay the award of the Contract for a period not to exceed ninety (90) days from the date of opening of bids, during which time bids shall remain open and not subject to withdrawal. The right is also reserved to the Board of Commissioners of Floyd County, Georgia to reject any and all bids and to waive any and all technicalities or informalities. Any contract executed pursuant to this notice shall be binding upon the Board of Commissioners of Floyd County, Georgia, as such, but will not create a liability expressed or implied, against any members of the Board of Commissioners of Floyd County, the Chairman of the Board, or employee of said County, in his or her individual capacity. The contract, if awarded, will be on a lump sum basis or individual item basis, whichever is in the best interest of the County. No bid may be withdrawn for a period of 90 days after time has been called on the date of opening.

Award

Residential Subdivision

$73,415.00

Public - County

Renovation

7

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
83
Bidding Soon
1,418
All Active Projects
600
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.