BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Lexington, Virginia. Completed plans call for the construction of a 66,000-square-foot educational facility; for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

All inquiries for information shall be submitted using the Understanding of Requirements form by e-mail to procurement@vmi.edu. Questions must be received no later than 18 April 2024 by 2:00 PM EST. NO QUESTIONS WILL BE ANSWERED BY ANY OTHER METHOD. There will be NO pre-qualification conference. In compliance with this Request for Qualifications, including all provisions and attachments referenced herein, and subject to all the terms and conditions set forth herein, the undersigned offers and agrees to furnish the services described. It is understood that this proposal may be modified, by mutual agreement in subsequent negotiations. PURPOSE The purpose of this Request for Qualifications (RFQ) is to obtain from interested Contractors their Statement of Qualifications in order to select a list of pre-qualified Contractors to submit proposals to act as Construction Manager at Risk on the CLE Ph 2 and Parking Structure Project. Project Description: The Center for Leadership and Ethics (CLE) Phase II project will create a multi-purpose facility serving Cadets, staff, employees, alumni and faculty at Virginia Military Institute. It will be located adjacent to the existing, Center for Leadership and Ethics (Marshall Hall) on 2.3 acres of land owned by VMI in the northwest corner of the main Post area. The project will include a 66,000 square foot, a multi-story facility featuring office spaces, classrooms, a theater, activity and event spaces, relocation of the VMI Museum housing multiple exhibits and historic gun collection, dining and food service areas as well as meeting rooms. Primary uses include cadet leader development activities, classroom and office space for mandatory leader development courses, hosting guest speakers, providing tours and interactive learning opportunities for visiting student and tour groups, supporting conferences and hosting special events. The project also includes construction of a 425 space, a multi-level parking structure as part of and adjacent to the Center for Leadership and Ethics, Phase II facility. The existing 149 car CLE surface lot will be eliminated to provide space for a traffic circle, parking structure entrance, pedestrian walkways and green space. Anticipated Construction Start Date: June 2026 Anticipated Construction Duration: 30 months Justification for CM at Risk: CLE Phase II and Parking Structure is a large, technically complex project located on a topographically challenging site in a sensitive, historic district. The location, topography, and layout of the site in this compact historic area will require early involvement by the CM for constructability reviews and design input due to the significant coordination and extreme care required to protect adjacent cultural and historic resources and adjacent properties belonging to Washington and Lee University (WLU). Early CM involvement is also critical to addressing difficulties associated with the site location (size, slopes, access, adjacent structures), traffic issues and unknown subsurface conditions. CM involvement in the design phase is essential to performing constructability analyses, planning for long lead-time items, sequencing and phasing of work, cost analysis and value engineering concurrently with the design process to ensure the project remains on schedule and within scope and budget. Site access is restricted to one highly used, restricted width, restricted turn radius, street making everything from material deliveries to utilities work and equipment erection difficult operations requiring detailed planning and coordination early in the design process.

Post-Bid

Educational

$1,762,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
23
Bidding Soon
321
All Active Projects
144
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 1, 2026

img_map_placeholder

319 Letcher Ave, Lexington, VA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.