Site work and paving for a mixed-use development in Ripon, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 10, 2024 project was awarded to Egbert Excavating, awarded amount is $932,348,50. CITY OF RIPON is requesting Bids for the construction of the following Project: ST WENCESLAUS ST RECONSTRUCTION Project # 00026049 The Project includes the following Work: roadway and utility reconstruction of St Wenceslaus St from E Sullivan St to E Fond du Lac St. Utility Construction: approximately 1,200' of PVC water main (4" -8") including valves, hydrants, appurtenances and services; approximately 750' of PVC sanitary sewer (8"-12") including manholes and laterals; approximately 2,000' of storm sewer, RCP and HDPE (12"-36") including manholes and inlets. Roadway Construction: approximately 1,100' of roadway excavation and grading, geotextile fabric, breaker run, dense graded base, hot mix asphalt, concrete & asphalt driveway replacement, concrete sidewalk and concrete curb & gutter. Tree removal, clearing, grubbing, site restoration, traffic control and erosion control are included in the project. The project is being partially funded by Wisconsin DOT LRIP. The anticipated substantial completion date is October 25, 2024 and final completion date is November 8, 2024. Instructions to Bidders. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond Project #00026049 Advertisement for Bids (C) 2024 MSA Professional Services, Inc. will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages . No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. Owner reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the City of Ripon. Question deadline 04/11/2024

Award

Roads / Highways

$932,349.00

Public - City

Paving, Site Work

35

16

11

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
48
Bidding Soon
785
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 6, 2024

img_map_placeholder

St Wenceslaus St, Ripon, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.