BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2024 at 8:00 PM

Updated August 20, 2025

Site work for a mixed-use development in Santa Maria, California. Completed plans call for site work for a pre-engineered storage facility.

The Project consists of: Santa Maria High School The addition of a steel framed metal canopy for the existing SMHS CTE building. Ernest Righetti High School The addition of a steel framed metal canopy for Building I, ERHS CTE. Demolition of existing CMU exterior storage with metal roof and construction of new CMU walls/gates/covering and associated site work. To bid on this Project, the Bidder is required to possess one or more of the following State of California contractors' license(s): B The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. A bid bond by an admitted surety insurer on the form provided by the District a cashier's check or a certified check, drawn to the order of the Santa Maria Joint Union High School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. The successful Bidder will be required to certify that it either meets the Disabled Veteran Business Enterprise ("DVBE") goal of three percent (3%) participation or made a good faith effort to solicit DVBE participation in this Contract if it is awarded the Contract for the Work. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to SSDBids@smjuhsd.org. Questions received less than SEVEN (7) calendar days prior to the date for opening bids may not be answered.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,064,511.00

Public - City

Site Work

32

43

29

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
1
Bidding Soon
263
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

September 16, 2024

Project location map

Multiple Locations, Santa Maria, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.