Site work for a water / sewer project in Greensburg, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of May 15, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The Work to be done under the Contract, as shown on the Plans and Specifications, shall include the furnishing and complete installation of all Materials and any other necessary Work required for proper completion, operation and use of the facilities. All the equipment, Materials and labor that may be necessary to complete the Work and place it in satisfactory operation, implied or intended in the Plans and Specifications, shall be furnished and/or installed by Contractor without extra cost to the Owner. The titles or headings of the various divisions, sections, paragraphs, subparagraphs or of Shop Drawings, and the Table of Contents and the indexes, as used in any of the Contract Documents are for convenience of reference only and are not intended to limit and shall not be construed as in any way limiting the application of the text. Bids can either be mailed using the above address or dropped off in the "Bid Mailbox" located at the entrance to the Distribution and Engineering Office Building 3. A picture of the New Stanton Campus Layout as well as the drop-off location are included with the bid specifications to provide clarification. Contract Documents, including Drawings and Detailed Specifications, are on file at the office of Gibson-Thomas Engineering, 1004 Ligonier St., Latrobe, PA 15650 Bidders will be responsible for viewing the project on their own. Any questions regarding the project must be submitted to Chris Wharton no later than 4:00 P.M. on April 17, 2024 via fax (724) 539-3697 or email at chris.wharton@gibson-thomas.com Bid Packages must be clearly marked "PROPOSAL ENCLOSED - CONTRACT R003-25 or R004-25 with the associated contract number on the lower left corner of the Bid Envelopes. All bids received will be opened and read at the New Stanton Campus Wastewater Building Lunchroom at the time and place designated above. Each proposal shall be accompanied with a certified check or Bid Bond in the amount of ten percent (10%) of the proposal, in favor of the Municipal Authority of Westmoreland County. No bid may be withdrawn for sixty (60) days after the same has been filed with the Municipal Authority of Westmoreland County. Pennsylvania Prevailing Wages are applicable to this project. Any bid not submitted under the conditions provided herein will be rejected. The Municipal Authority of Westmoreland County reserves the right to reject any or all bids or to waive any informality in bids received or to accept any bid it deems in its best interest.

Bid Results

Water / Sewer

$586,111.00

Public - County

Site Work

9

13

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Seeding, Plants, Ground Covers, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Storage Tanks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
116
Bidding Soon
925
All Active Projects
441
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

June 24, 2024

img_map_placeholder

Multiple Locations, Greensburg, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mt. Pleasant #2 Tank Painting

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.