BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2024 at 8:00 PM

Updated April 23, 2024

Renovation of a water / sewer project in Fallsburg, New York. Conceptual plans call for the renovation of a water / sewer project.

WHEREAS, The Town of Fallsburg owns and operates three public wastewater treatment plants (WWTP). The smallest of the three plants, located in the hamlet of Mountain Dale, was constructed in 1985. No major upgrades to the plant have occurred since its construction over 30 years ago. The WWTP is nearing its treatment capacity in the summer months, and many of the treatment systems and mechanical components are at the end of their useful lives. In order to protect nearby water bodies and groundwater from unnecessary and preventable environmental pollution, a comprehensive evaluation of the condition of the plant's equipment and treatment process is needed. Expected outcomes and deliverables will be an Engineering Report that will assess the plant's current condition, evaluate the need for additional capacity, and explore alternative wastewater treatment processes to meet current and future requlatory requirements. WHEREAS, The project has qualified for funding from the NYS Environmental Facilities Corporation (EFC) Engineering Planning Grant program for the amount of $50,000. Through the EPG, the municipality is required to provide a $10,000 match. WHEREAS, The selected firm should be ready to start the work as soon as MAY 1, 2024. All work on the l&l Study must be completed by APRIL 1, 2025. The PER must be completed by MAY 1, 2025 in order to meet funding requirements. Further planning, design, bidding, and construction timeframes will be evaluated as part of the PER and will be established as the project progresses. The Board reserves the right to accept or reject any and all Statements of Qualifications in whole or in part, to waive any and all informalities, require supplemental statements or information from any responsible party, have discussions with any respondent to this RFQ to correct and/or clarify responses and negotiate potential contract terms with the most highly qualified firm. Questions and clarifications on any items related to this RFQ should be directed to KEN ELLSWORTH, P.E., TOWN ENGINEER via email at kellsworth@keyscomp.com or by phone at 845-434-6320. 2. The Supervisor is hereby authorized to execute an Engineering Planning Grant (EPG) Agreement with the New,York State Environmental Facilities Corporation (NYS EFC) and any and all other contracts, documents, and/or instruments necessary to facilitate the EPG project referenced herein and to fulfill the (name of municipality's) obligations thereunder; 3. The Town of Fallsburg hereby authorizes and appropriates a minimum 20% local match as required by the Engineering Planning Grant Program for the PRELIMINARY ENGINEERING REPORT - MOUNTAIN DALE WASTEWATER TREATMENT PLANT UPGRADE in the amount of $10,000.00 and based upon the total EPG Grant award of $50,000.00;, BE IT FURTHER RESOLVED, the source of the local match, and any amount in excess of the required match, shall be provided by the Town of Fallsburg General Fund. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$1,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
702
Active Projects
364
Bidding Soon
5,921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2024

Project location map

To Be Determined, Fallsburg, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.