Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2024 at 8:00 PM

Updated October 28, 2025

Site work and asbestos abatement for a mixed-use development in Peoria, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Summer Abatement Projects At Kellar Primary School, Rolling Acres Middle School, Dr. C.t. Vivian Primary School, Robert A. Jameison School, Woodruff Career Center And Franklin Primary School. Each Bid Must Be Accompanied By A Bid Guarantee In The Form Of A Bid Bond From A Company With An A-1 Best Rating, In The Amount Equal To Not Less Than Ten Percent (10%) Of The Bid And Made Payable To Peoria Public School District #150 , 3202 N. Wisconsin Avenue, Peoria, Il 61603. No Bid Shall Be Withdrawn For A Period Of Thirty (30) Days After The Bid Opening Date Without The Consent Of The Owner. Checks Or Drafts Of Unsuccessful Bidders Will Be Returned As Soon As Practicable After Opening And Checking The Bids. Successful Bidder Must Provide A Performance Bond And A Labor And Material Payment Bond In The Full Amount Of The Contract, Acceptable To The Owner. Each Bidder Is To Submit A Lump Sum Bid And Requested Alternate Bids For The Entire Project. Bidder Shall Include The Cost The Required Performance And Payment Bond In This Sum. The Asbestos Abatement Contractor (Bidder) Is Responsible For All Work Outlined In The Project Specifications Which Is Not Bid As A Separate Contract; However, The Bidder Will Not Be Responsible For Coordination Of Trades That Are Not Part Of The Bidder's Contract. The Owner Reserves The Right To Reject Any Or All Bids And To Waive Any Informalities In Bidding. Site Walkthrough Notes : Vivian Primary School, Robert A. Jameison School, Woodruff Career Center And Franklin Primary School. Attendance At This Walkthrough Is Mandatory. Failure To Attend Will Result In Disqualification Of The Bidder's Bid. By Submission Of Bid, It Is Understood That The Bidder Has Satisfied This Mandatory Requirement.

Post-Bid

Educational

$7,000.00

Public - City

Asbestos Abatement, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
113
Bidding Soon
1,394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2024

May 22, 2024

Project location map

Multiple Locations, Peoria, IL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed