BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Harrison, Tennessee. Completed plans call for site work for a playground / park / athletic field.

The project consists of construction of a synthetic turf full depth install with under drain system for 5 infields @ Harrison Recreation Center, located @ 5637 TN-58, Harrison TN 37341. Contract Time- 90 calendar days Question Deadline 05/03/2024 - No interpretation of the meaning of the bid documents will be made to any bidder orally. Every request for such interpretation shall be in writing addressed to autumnf@hamiltontn.gov . Any questions concerning the bid documents must be received by the engineer no less than ninety-six (96) hours before bid opening date. This project includes installation of a complete full depth install synthetic turf system including under field drainage, field markings, resilient infill material and field turf for 5 infields only @ Harrison Recreation Center. The lump sum bid shall include the construction of synthetic turf system, under field drain system with collector pipe, laser grading, demolition, erosion control measures, earthwork and accessories. Contractor shall include all labor, supervision, equipment, and all other incidentals to construct the synthetic turf and under field drain system per required regulations, and attached plans and specifications. Contractor shall be required to verify the location of all utilities and coordinate any utility relocations with utility companies and/or Hamilton County Parks and Recrecation. Contractor shall be a member of "American Sports Builder Association" or have 5 years experience in full depth install of synthetic turf. Contractor shall submit 3 references with full depth installation of synthetic turf. Contractor shall submit "as-built" drawings as part of the close-out documentation. All permit fees shall be included in lump sum bid. 1. Contractor shall provide all site preparation including all required clearing an grubbing, proper disposal of waste material, and existing culvert material. 2. Contractor is responsible for locating all utilities. Contractor shall determine the locations and depths of all existing utilities. 3. Contractor is responsible for all survey and layout of the project. 4. Earthwork grading, excavation, backfilling, and compaction of base material. Excavation work is specified as "unclassified". Unclassifed excavation includes all excavation, regardless of type, nature or condition of materials encountered. The Contractor assumes full responsibility to estimate the kind and extent of the various materials to be encountered in order to accomplish the work. Contractor is responsible for all quality control testing required to install the bridge system in accordance with manufacturer's requirments. 5. Contractor is responsible for installation and maintenance of erosion control measures as required by TDEC. SWPPP has been submitted to TDEC. 6. Hamilton County has applied for an LDP throufh the City of Chattanooga. Contractor is repsonbille for obtaining permit. 7. Contractor is responsible for installation and maintenance of safety fencing around all work and the posting of safety signs. 8. The Contractor shall keep the project area clean, and make sure that no trash or construction debris are strewn about the job site. All waste material and debris shall be properly disposed of on a daily basis.

Award

Playgrounds / Parks / Athletic Fields

$638,635.00

Public - County

Site Work

34

8

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
29
Bidding Soon
737
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 6, 2024

img_map_placeholder

5637 TN-58, Harrison, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.