EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Harmony, Pennsylvania. Completed plans call for the renovation of a educational facility.

The Board of Education of the Seneca Valley a/ School District, Harmony, Pennsylvania will receive separate sealed proposals for the QUARRY TILE REPLACEMENT PHASE 3 - RYAN GLOYER MIDDLE SCHOOL project, 122 Seneca School Road, Harmony Pennsylvania, under single Prime Contract, General Construction (GC). Each bid must be accompanied by a proposal guaranty of not less than ten percent (10%) of the total of the Base Bid Project is subject to applicable provisions of the Pennsylvania Prevailing Wage Act, Act of August 15, 1961, P.L. 987. as amended and supplemented owner reserves the right to accept or reject any or all Bids or parts thereof or items therein and to waive any informality in the bidding Questions pertaining to the content of the Bid- ding Documents shall be directed to Brian Fulker- son and Terri Hoover, Eckles Construction Services, by email at blf@ecklesgroup.com a tkh@ecklesgroup.com using the approved Pre- Bid RFI form. Phone calls will not be accepted.

Award

Educational

$597,400.00

Public - County

Renovation

8

9

2

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
74
Bidding Soon
1,133
All Active Projects
526
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

June 7, 2024

img_map_placeholder

122 Seneca School Rd, Harmony, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Quarry Tile Replacement Phase 3 - Ryan Gloyer Middle School Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.