BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Galveston, Texas. Completed plans call for the renovation of a post-secondary education facility.

The scope of this project includes, but is noit limited to, the following: renovation of an educational facility. As of April 8, 2024, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released. 1. All surface preparation and painting of walls, doors (both sides), trim (door frames-common area side only) and window frames (if applicable), ceilings (if applicable), hallways/corridors/stairwell entry and trims (if applicable) shall be completed by the Contractor. (if applicable means painted surfaces, if the surface is not currently painted then painting does not apply). 2. Closely examine all surfaces. Any that are in question or will affect the quality of the work must be brought to the Owners attention prior to providing a proposal or bid for the requested scope of work. The application of paint to any surface by the Contractor is confirmation by the Contractor that the surface provided is sufficient and satisfactory to result in a high-quality finish 3. Workmanship shall be of the highest quality. 4. All work, including disposal, shall be performed in accordance with all applicable local, state and federal regulations. In addition, all safety precautions shall be observed by the Contractor and subcontractors. Disposal is the Contractors responsibility. The Contractor shall maintain cleanliness of the property and areas defined in the projects scope at all times. 5. High reach areas shall be access by man-lift or ladder. Fixed scaffolding that impedes access inside the common areas, hallways and corridors of the building shall be allowed but must be approved prior to work starting. 6. Contractor shall be responsible to provide storage for equipment and materials if needed, some arrangements can be made for localstorage adjacent to the work areas and must be approved prior to work start. The Contractor is to provide all supervision, labor, equipment, tools, supplies and materials to complete the scope of work. 7. Contractor shall be responsible for requesting prompt clarification when instructions are lacking, or the procedure is not clearly understood. 8. All work is to be performed during normal or regular business hours. (7A-5P). The Contractor will be required to "check-in" and "check-out" daily at the Facilities Services Building

Post-Bid

Educational

$750,000.00

Public - State/Provincial

Renovation

8

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
61
Bidding Soon
2,583
All Active Projects
1,060
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.