BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2024 at 7:00 PM

Updated December 24, 2024

Demolition, site work and addition to a water / sewer project in Pearland, Texas. Working plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025005324 Project Name: Barry Rose Water Reclamation Facility Replacement, Expansion and Longwood WRF Decommissioning Project Number: TABS2025005324 Facility Name: Administration and Maintenance Building Location Address: 2012 Barry Rose Road Pearland, TX 77581 Location County: Brazoria Start Date: 1/9/2025 Completion Date: 10/18/2027 Estimated Cost: $1,735,000 Type of Work: New Construction Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Construction of a new Administration and Maintenance Building at the Barry Rose Water Reclamation Facility. Building will include office space, laboratory, break room, restroom, and maintenance area. Total area of the building is 2,331 sf. Square Footage: 2,331 ft 2 ---------------------------------------------------------------------------------------------------- McCarthy Building Company, the Construction Manager at Risk (CMAR) for the Barry Rose Wastewater Reclamation Facility (WRF) expansion and Longwood WRF Decommissioning Project, is seeking interested suppliers, contractors and subcontractors to perform specified scopes of work on the construction of a greenfield 5.0 MGD average daily flow (ADF) project for the CITY OF PEARLAND. The project consists of a wastewater treatment plant at the Barry Rose site with biosolids handling, an operations/lab building, site civil improvements, utility establishment, plant-wide power distribution, controls system, security system, and decommissioning of the existing Barry Rose WRF located at 1902 1/2 Barry Rose Rd., Pearland, TX 77581. The project will also include improvements to the Longwood Site consisting of construction of a new diversion lift station with firm pumping capacity of 8.0 MGD and decommissioning of the existing Longwood WRF, located at 2727 Dixie Farm Road, Pearland, TX 77581. A 20-inch diameter force-main will connect the two sites. The Barry Rose project is planned to be procured via a phased construction approach, Phase 1 procurement is already in-progress, opportunities remain for interested vendors and contractors to pursue scopes of work in phases 2 and 3. Phase 1: Process Equipment Procurement, Preliminary site-work, mobilization and yard-piping, earthwork and concrete for the Sequencing Batch Reactor structure. Phase 2 is composed of nearly every trade in the Waste-water plant construction industry including and will include the majority of the work occurring at the Barry Rose and Longwood sites.

Final Planning

Water / Sewer

$42,000,000.00

Public - City

Addition, Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
221
Bidding Soon
3,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.