BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2024 at 8:00 PM

Updated May 18, 2024

Site work for a water / sewer project in West Point, Utah. Completed plans call for site work for a water / sewer project.

Construction of two new sewer lift stations with an initial capacity of 1.3 mgd each and a build-out capacity of 2.22 mgd and 2.07 mgd for Lift Stations 1 and 2 respectively. Lift Station 1 is located at 6467 W 2425 N, West Point, Utah and Lift Station 2 is located at 5812 W 1925 N, Hooper, Utah. Each lift station includes deep excavation with extensive dewatering, dry pit submersible non-clog wastewater pumps, in-channel grinders, equipment handling facilities, electrical power and control system, stand-by generator and transfer switch, HVAC systems and equipment, cast-in-place grinder vault, wet well, and dry pit, CMU building with equipment access area, electrical room, civil site and road improvements, and connections to a new gravity sewer and a new sewer force main constructed by others. The bid includes five bid schedules: Bid Schedule A - Sewer Lift Station 1 Bid Schedule B - Sewer Lift Station 2 Bid Schedule C - Lift Station 1 Pump Alternatives Bid Schedule D - Lift Station 2 Pump Alternatives Bid Schedule E - Price Reduction if Contractor is Awarded Both Lift Stations 1 and 2 Owner Rights: The Owner reserves the right to award each lift station to two separate contractors or award both lift stations to a single contractor based on the results from all five bid schedules. Project has an expected duration of 548 calendar days. Liquidity Damages: . Bid prices will be compared after adjusting for differences in time of Substantial Completion (total number of calendar days to substantially complete the Work) designated by Bidders. The adjusting amount will be determined at the rate set forth in the Agreement for liquidated damages for failing to achieve Substantial Completion, or such other amount that Owner has designated in the Bid Form. Bond Notes: A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner's requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation. Question Deadline 04/23/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. All questions shall be submitted on the SciQuest

Post-Bid

Water / Sewer

$1,600,000.00

Public - City

Site Work

203

43

17

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
101
Bidding Soon
944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

July 1, 2024

Project location map

Multiple Locations, West Point, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.