BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Morris, Minnesota. Completed plans call for site work for a water / sewer project.

The Project includes the establishment of Vegetative Treatment Areas (VTA) to manage water quality from its cattle farm operations, improvements to an existing manure stacking pad, stormwater conveyance improvements, and the decommissioning of a stormwater pond. Work is permitted under the University of Minnesota Building Codes Department for compliance with MPCA and Stevens county interim operating permit requirements. A MnDoT permit for miscellaneous work on a trunk highway right of way is expected to be required in addition to coordination with Northern Natural Gas for the portion of the work performed in their easement. Anez Consulting is the Architect/Engineer of Record for the Project. Deadline for RFP Questions April 25, 2024 at Noon Identification of Potential Selected Respondent May 10, 2024 Anticipated Authorization to Proceed May 15, 2024 A Pre-Proposal Meeting has been scheduled (via a Zoom Meeting) for the date and time noted in section 2.1 of this RFP. In the interests of public health, this meeting will occur digitally with no in-person attendance permitted. Participation at this Pre-Proposal Meeting is not mandatory; however, it is highly encouraged for prime firms that are interested in responding to this RFP. Project Description (the Work) The Project includes the establishment of Vegetative Treatment Areas (VTA) to manage water quality from its cattle farm operations, improvements to an existing manure stacking pad, stormwater conveyance improvements, and the decommissioning of a stormwater pond. Work is permitted under the University of Minnesota Building Codes Department for compliance with MPCA and Stevens county interim operating permit requirements. A MnDoT permit for miscellaneous work on a trunk highway right of way is expected to be required in addition to coordination with Northern Natural Gas for the portion of the work performed in their easement. Anez Consulting is the Architect/Engineer of Record for the Project.

Post-Bid

Water / Sewer

$150,000.00

Public - State/Provincial

Site Work

6

6

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
8
Bidding Soon
93
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

img_map_placeholder

46352 MN-329, Morris, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.